Similar Projects
Spokane Airport Board - Fuel Control Facility Metering Upgrade
Renovation
Design
$70,000 CJ est. value
Spokane, WA 99224

South Everett Community Solar Project
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Everett, WA 98204

65th Avenue Campus Development: Access Controls
Renovation
Sub-Bidding
$420,000 CJ est. value
Vancouver, WA 98661

Howard A. Hanson Dam (HAHD) Emergency Gate Stoplog and Hoist Replacement
Demolition, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Ravensdale, WA 98051

On Call Industrial Equipment and Electrical Services
Term Contract
Post-Bid
$500,000 est. value
Tacoma, WA

Salmon Creek Treatment Plant Equipment and Materials for the Phase 5B Package 2 Secondary Treatment Process Improvements Project
Alteration
Results
$758,800 est. value
Vancouver, WA 98685

Inductive Charging Infrastructure for Everett Transit
Alteration
Results
$250,000 est. value
Everett, WA 98201

Install Electronic Variable Message Sign
Renovation, Infrastructure
Sub-Bidding
$500,000 CJ est. value
Fairchild Air Force Base, WA 99011

Hydraulic Systems Maintenance and Repair
Term Contract
Post-Bid
Seattle, WA 98134

Siftings Flights
Term Contract
Results
Spokane, WA

Mobile Showers, Restrooms, Laundry Units
Term Contract
Post-Bid
Vancouver, WA

SA387 Grade 22 Class 2, 3/16" X 48" X 96" Qty 69 Sheets with MTRs; to Include Delivery
Alteration
Results
$68,500 est. value
Spokane, WA

Infrared Moisture Sensor with Airblast to Keep Lens Clear
Alteration
Post-Bid
Spokane, WA

Locking Bars for Refuse Container - Value Blanket
Term Contract, Alteration
Results
Spokane, WA

Sheet Steel Storage Rack
Term Contract
Post-Bid
Bremerton, WA 98314

Last Updated 08/06/2023 12:02 AM
Project Title

Bell Tower Water Fixture Replacement

Physical Address View project details and contacts
City, State (County) Seattle, WA 98121   (King County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $58,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall supply and install the following for 120 units: water-efficient showerheads, kitchen faucet aerator, bathroom faucet aerator, and toilets with seats in each unit of Bell Tower (2215 1st Ave, Seattle WA 98121). Question Deadline 07/26/2023 at 4:00 PM PT DEADLINE FOR QUESTIONS: Email your questions to: purchasing@seattlehousing.org SHA shall be responsible for posting notice to tenants, providing either onsite or nearby storage space for toilets and fixtures to be installed, and space onsite for waste collection. The contractor shall acquire, transport and deliver all necessary toilets, showerheads and aerators to each site. The service provider shall: replace showerheads in all showers with Niagara Earth 3-spray Wall Mount Handheld Showerhead with flow rate at or below one and a half gallons per minute (1.5 gpm), or approved equivalent, except where ADA compliant equipment is required and not met by the replacement, install aerators on all sink faucets where possible with aerators with flow rates of one gallon per minute (1 gpm) or less, and, replace all toilets with Niagara Stealth eight tenths of a gallon per flush (0.8 gpf) and raised push buttons, or approved equivalent, except in cases indicated in Section 5, "Special Considerations," of this contract.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents