Similar Projects
Interior Renovation for Feagin Mill Middle School
Renovation
Bidding
Less than $5,500,000 est. value
Warner Robins, GA 31088

Summer 2021 Renovations and Upgrades
Renovation
Post-Bid
GA

Manchester High School Agricultural Mechanics Lab Modification
Renovation
Post-Bid
Greenville, GA

Disaster Recovery Services
Results

Disaster Recovery Services
Results

General Contractor Services - Coralwood Diagnostic Center Additions and Renovations
Renovation, Addition
Construction
Less than $5,600,000 est. value
Tucker, GA

Gifted Academy Gym Renovations and Modifications
Renovation
Construction
Less than $1,850,000 est. value
Dublin, GA 31040

Atlanta Virtual Academy
Renovation
Post-Bid
Atlanta, GA 30318

Cobb Horizon High School Replacement
Renovation - 37,398 SF
Results
Less than $1,156,800 est. value
Marietta, GA 30152

Spalding High School - Renovations and Modifications
Renovation
Results
$7,657,500 est. value
Griffin, GA 30224

Brookwood and Grayson HS-CTE Modification [AG/Stem Eng Labs]
Results
Snellville, GA 30078

Modular Classroom Buildings
New Construction
Results
Atlanta, GA 30344

Last Updated 11/30/2021 03:53 PM
Project Title

Additions and Renovations to Existing Auditorium

Physical Address View project details and contacts
City, State (County) Blakely, GA 39823   (Early County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Middle/Senior High School, Theaters/Auditoriums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and consists of the following: 1. Auditorium Addition & Renovations at Early County High School 2. The Work includes, but is not limited to: a. Site clearing and grading. b. Selective Demolition c. Erosion, Sedimentation & Pollution Control d. Site Improvements. 1) Concrete Sidewalks 2) Curb & Gutter 3) Fencing 4) Storm Sewer System 5) Site Utilities 6) Auditorium Seating e. Temporary & Permanent Grassing.

Details

Middle/Senior High School, Renovation, Theaters/Auditoriums, 1 Story Above Grade, 17,136 SF Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating, Fixed Audience Seating.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents