Similar Projects
Window Repair
Renovation
Design
$300,000 CJ est. value
Elmsford, NY 10523

Window Repair
Renovation
Design
$300,000 CJ est. value
Elmsford, NY 10523

Roof and Interior Plaster Repairs at Patricia A. Dichiaro School 8
Renovation
Post-Bid
Yonkers, NY 10708

Mamaroneck UFSD - 2019 Bond Referendum - Capital Improvements at Mamaroneck High School - Phase 2
Renovation
Post-Bid
Mamaroneck, NY 10543

Farragut Middle School Auditorium
Renovation - 2,909 SF
Results
Hastings-on-Hudson, NY 10706

Renovations at Dows Lane Elementary School
Renovation
Results
Irvington, NY 10533

Ossining High School 3rd Floor Connector
Renovation
Construction
Ossining, NY 10562

Mamaroneck UFSD Capital Improvements at Central School - Phase 2
Renovation
Construction
Larchmont, NY 10538

High School Parking Garage - Charter School of Educational Excellence
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Yonkers, NY 10701

John Jay High School - 2022 Bond - Katonah-Lewisboro School District
Renovation
Pending Verification
$12,400,000 CJ est. value
Cross River, NY 10518

Phase I of Roof, Doors, Boiler System Replacement, and Site Upgrades at School 29
Renovation
Post-Bid
Yonkers, NY 10710

Mamaroneck UFSD - 2019 Bond Referendum - Capital Improvements at Murray Avenue School
Renovation
Results
Larchmont, NY 10538

Blind Brook-Rye U.F.S.D. - Elementary School Enrichment Center Alterations
Renovation - 2,210 SF
Construction
$324,300 CJ est. value
Rye Brook, NY 10573

John Jay Middle School - 2022 Bond - Katonah-Lewisboro School District
Renovation, Infrastructure
Pending Verification
$9,600,000 CJ est. value
Cross River, NY 10518

Pocantico Hill CSD 2021 Capital Improvement Project - Phase I
Renovation
Post-Bid
Sleepy Hollow, NY

Last Updated 07/19/2023 01:07 PM
Project Title

Phase 2 Bond Improvements - Briarcliff Manor MS/HS, Todd Elementary School - General Contractor Work (GC-2) (Single Prime Contract)

Physical Address View project details and contacts
City, State (County) Briarcliff Manor, NY 10510   (Westchester County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $668,900 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For Briarcliff Manor Union Free School District (U.F.S.D) - Phase 2 Bond Improvements - General Contractor Work (GC-2) (Single Prime Contract) S.E.D. No. 66-14-02-02-0-004-023 (MSHS) 66-14-02-02-0-002-021 (ES) Overall Project Scope: 1. Interior Renovations to Library, Offices, Classrooms 2. Locker Relocations for Egress 3. Handrail/Guardrail Replacements 4. Exterior Masonry Reconstruction 5. Combustion Air Intake Louver Reconstruction 6. Ductwork & Chilled Water Piping Insulation Work 7. Replacement of Rooftop Units, VFD at Cafeteria RTU 8. Acid Neutralization Pit Reconstruction 9. Natural Gas Leak Detection System in Boiler Room 10. Hardwired CO Detectors in Select Areas 11. Select Student Toilet Rooms Reconstruction for ADA Locations- Briarcliff Middle/High School 444 Pleasantville Road Briarcliff Manor, NY 10510 Todd Elementary School 45 Ingham Road Briarcliff Manor, NY 10510 Checks or money orders shall be made payable to Briarcliff Manor Union Free School District. The Contract Documents may be examined at the Office of the Architect, BBS Architects, Landscape Architects and Engineers, P.C., 187 Wolf Road, Albany New York,12205 (518-621-7650) Plan deposit is refundable in accordance with the terms of the Information For Bidders to all submitting bids. Bidding Document costs are refundable provided the documents are returned to REVplans within thirty (30) days of the Bid Opening, and are in COMPLETE, UNMARKED and NOT TORN condition. Any bidder requiring printed documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. PLEASE NOTE: When ordering, please provide the following information: Company Name Contact Name Shipping Address Phone Number Fax Number E-mail Address Shipper Account Number (UPS or FedEx) All bid addenda will be transmitted to registered plan holders via email and will be available at the above referenced websites. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit for hard copies will be returned upon receipt of plans and specifications, in good condition, within thirty days after bid date, except for the lowest responsible bidder, whose check will be forfeited upon the award of the contract. The Contract will be awarded to the lowest responsible bidder or the proposals will be rejected within 45 days of the date of opening proposals. Bids shall be subject, however, to the discretionary right reserved by the School District to waive any informalities, accept or reject any alternatives, reject any proposals and to advertise for new proposals, if in its opinion the best interest of the School District will thereby be promoted. Each bidder may not withdraw his bid within 45 days after the formal opening thereof. A bidder may withdraw his bid only in writing and prior to the bid opening date. Project Closeout (Entire Project): 9/30/2024

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts