Last Updated | 12/18/2023 09:35 AM |
Project Title | McCall Primary School Flooring Replacement |
Physical Address | View project details and contacts |
City, State (County) | Acworth, GA 30101 (Cobb County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected February 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $581,607 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of, but is not limited to, the demolition of the existing finish flooring and base material including Vinyl Composite Tile (VCT) and Carpet. Testing for relative humidity, the preparation of the existing floor substrate, application of leveling compound, application of adhesives and installation of new Vinyl Composite Tile (VCT), Tile Carpeting, and Base Material including Transition Strips and Accessories. project no.2023-11 McCALLPRIMARY CCSD #S5K048MCAE, Bids submitted in any manner other than through the CCSD Bonfire Interactive Portal will not be accepted. The deadline for submitting pre-qualification requirements for this project is 3:00 PM ET on December 18, 2023. Contractors must provide proof of previous job experience within 30% of the cost of this project. CCSD will review the pre-qualification submittal and respond within five (5) business days. Contractor's Pre-Qualification submittal should be emailed to Wendy Bell at: wendy.bell@cobbk12.org. All communications concerning these documents and project must be submitted through the CCSD Bonfire Interactive Portal. Question Deadline 12/18/2023 at 3:00 PM ET Responses to all inquiries will be posted to the CCSD Bonfire Interactive Portal. Bid responses will only be accepted from companies that have purchased bid documents from the Architect/Engineer. The contract, if awarded, will be on the basis stated in the Instructions to Bidders. No bid may be withdrawn for 60 days after bid opening except within 48 hours if an appreciable error can be shown. Bid responses must be accompanied by a bid bond made payable to the Cobb County School District, in the amount equal to five (5) percent of the bid price. (Certified Checks Not Acceptable.). The successful bidder will be required to furnish a Performance Bond and a Payment Bond acceptable to the Cobb County School District in an amount equal to 100 percent of the contract price and executed by a Surety Company licensed to do business in the State of Georgia and listed in the Department of the Treasury Circular 570, latest edition. The Surety Company shall have an A.M. Best Company minimum rating of "A-" with a financial size of VI "6" or better. Bonds must be accompanied by a letter stating the bonding company's current rating for verification before acceptance by the Owner and execution of the formal Owner/Contractor agreement. Bonding of Subcontractors: Include in the Base Bid, Performance and Labor and Materials Payment Bonds, each in 100% of the subcontract sum, for each Subcontractor having a contract of $50,000.00 or more for Roofing, HVAC, Plumbing, Sprinkler System and Electrical Work as required by the General Conditions. Contractor and Subcontractors shall require the Attorney-in-Fact who executes bonds on behalf of sureties to attach a certified, current copy of his/her Power of Attorney. Cobb County School District reserves the right to accept or reject any or all bids and to waive technicalities and informalities. |
||
Details | 65,128 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |