Similar Projects
Resurface Barclay Boulevard from Aptaksic Road to Half Day Road in Lincolnshire
Infrastructure
Bidding
$4,000,000 est. value
Lincolnshire, IL 60069

Hot-Mix Asphalt Pavement
Infrastructure
Bidding
$500,000 est. value
Waukegan, IL

Washington Street Resurfacing
Renovation
Post-Bid
IL

Il Route 43 At Westleigh Road Intersection
Term Contract
Post-Bid
Lake Forest, IL 60045

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

Mass Grading to Construct a Flood Storage Detention Basin
Infrastructure
Bidding
$160,000 est. value
Libertyville, IL 60048

Central HS Parking Lot Improvements North HS Courtyard Improvements
Post-Bid
Grayslake, IL 60030

Concrete Curb & Gutter, Road Resurfacing, Sidewalk
Results
Less than $155,000 est. value
Highwood, IL 60040

Replacement of the Storm Sewer System
Infrastructure
Bidding
$700,000 est. value
Libertyville, IL

2021 Curb and Sidewalk Program
Post-Bid
Grayslake, IL

(5.660-Mile) Improvement on IL-173 (Rosecrans Road) from MC Henry Co
Results
Antioch, IL 60002

2022 Sidewalk Improvements Project
Infrastructure
Bidding
$280,000 est. value
Buffalo Grove, IL

2021 Crestfield Subdivision Resurfacing
Post-Bid
Indian Creek, IL

(4.176-Mile) Resurfacing (Smart Overlay), ADA Improvements
Results
North Chicago, Waukegan, IL 60064

Reported 06/01/2022 12:00 AM
Project Title

Laura B. Sprague School Bus Drop Off Project

Physical Address View project details and contacts
City, State (County) Lincolnshire, IL 60069   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids. Bids by Invitation.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

pavement removal, preparation of base, storm sewer improvements, curb and gutter, sidewalk removal and replacement, hot-mix asphalt binder and surface course(s), earth excavation, traffic control and protection, restoration, and other associated work at Laura B. Sprague School in the Village of Lincolnshire

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents