Similar Projects
North Broadway improvements- Gladstone to NE Barry Road - City of Kansas City
Infrastructure
Conception
$394,000 CJ est. value
Kansas City, MO 64155

Bardeaux Oaks Subdivision Paving - 0429-SUB4 - City of Yuma
Infrastructure
Conception
$325,000 CJ est. value
Holt, MO 64048

KC Tech Academy School Building / Liberty
New Construction, Infrastructure - 17,480 SF
Design
$9,000,000 CJ est. value
Liberty, MO 64068

Holiday Inn Express - Summit Street / Kansas City
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Kansas City, MO 64118

Resurface in the Watkins Mill State Park
Infrastructure
Bidding
$1,000,000 CJ est. value
Kansas City, MO 64167

Highway 33 Waterline Replacement
Infrastructure
Bidding
$1,000,000 CJ est. value
Kearney, MO 64060

Eye Center of Gladstone
New Construction, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Gladstone, MO 64118

Microsurface Designated Streets
Infrastructure
Post-Bid
$3,194,358 CJ est. value
Kansas City, MO 64106

Kansas City Temple - Grounds Building & Distribution Center
New Construction - 3,043 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Kansas City, MO 64119

Traffic Signal Modification at Gregory and Ward Parkway
Infrastructure
Results
$537,646 CJ est. value
Kansas City, MO 64113

MKC Rehabilitate Runway 3-21
Infrastructure
Results
$7,524,833 CJ est. value
Kansas City, MO 64116

Ford Motor Company Stamping Plant / Liberty
Addition, Demolition, Infrastructure - 55,000 SF
Construction
$6,424,320 CJ est. value
Liberty, MO 64068

Commerce Bank - Liberty Bell Circle / Liberty
New Construction, Infrastructure - 7,000 SF
Construction
$2,000,000 CJ est. value
Liberty, MO 64068

Liberty Self-Storage
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Liberty, MO 64068

Eagle Valley Mixed-Use / Kansas City
New Construction, Infrastructure - 51,500 SF
Pending Verification
$212,000,000 CJ est. value
Kansas City, MO 64157

Last Updated 04/11/2023 11:04 AM
Project Title

St. Andrew the Apostle Parish Additions and Renovations

Physical Address View project details and contacts
City, State (County) Gladstone, MO 64119   (Clay County)
Category(s) Heavy and Highway, Religious/Funeral
Sub-Category(s) Religious Facility, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Public Notes: This request is specifically for Sub-Contractors Straub Construction is the Construction Manager for the Catholic Diocese of Kansas City - St. Joseph on this project. TAX EXEMPT STANDARD WAGES Construction of a new 52,000 SF church and bell tower on an existing site containing anexisting church and school. The new church structure will consist of conventional steel,cold-form framing and cold-form roof trusses. Most of the exterior facade will be brick and stone. An existing rectory building, and church building will be demolished as a part of project. The school cafeteria connected to the existing church will be modified as indicated in the documents. Site work will consist of demolition, mass excavation, new utilities/utility relocation, parking lot expansions and landscaping. Direct questions to the preconstruction team below: Divisions 3, 4 ,5 - Sean Lohman - slohman@straubconstruction.com Divisions 31, 32, 33 - Ernie Straub IV - estraub4@straubconstruction.com All other divisions - Henry Falk - hfalk@straubconstruction.com The Deadline for Questions is Tuesday, February 14, 2023 at 4:00 PM

Details

52,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents