Similar Projects
Juniper Ridge Public Works Administration, Lab, and Warehouse - FA25AX - City of Bend
New Construction, Infrastructure
Conception
$48,804,000 CJ est. value
Bend, OR 97703

Pool Deck Re-Surface - City of Forest Grove
Infrastructure
Conception
$250,000 CJ est. value
Brothers, OR 97712

Cottages on Helmholtz
New Construction, Infrastructure
Design
$32,800,000 CJ est. value
Redmond, OR 97756

Cottages on Helmholtz
New Construction, Infrastructure
Design
$32,800,000 CJ est. value
Redmond, OR 97756

2022 Type III Slurry Seal Project
Infrastructure
Post-Bid
$571,000 est. value
Redmond, OR 97756

2022 Seal Coat Liquid Roads Ultra Project
Term Contract
Post-Bid
$100,000 est. value
Redmond, OR

2022 Street Preservation
Infrastructure
Results
$2,365,000 est. value
Bend, OR 97703

2022 Street Overlay Project
Infrastructure
Results
$420,000 est. value
Redmond, OR 97756

New Redmond Library - Deschutes Public Library District Bond
New Construction, Infrastructure
Construction
$47,270,000 CJ est. value
Bend, OR 97703

New Redmond Library - Deschutes Public Library District Bond
New Construction, Infrastructure
Construction
$47,270,000 CJ est. value
Bend, OR 97703

Student Success Center - Oregon State University-Cascades
New Construction, Infrastructure - 22,500 SF
Pending Verification
$18,800,000 CJ est. value
Bend, OR 97702

New Stevens Ranch Library - Deschutes County
New Construction, Infrastructure
Pending Verification
$113,000,000 CJ est. value
Bend, OR 97703

Brosterhous and Chase Intersection - 1TCHI - City of Bend
Infrastructure
Conception
$1,000,000 CJ est. value
Bend, OR 97702

US97: Multi-Use Trail (Baker Rd. - Lava Butte)
Infrastructure
Design
$4,677,000 CJ est. value
Bend, OR 97707

ESB Klamath Falls Mile Marker Replacement Rebid
Infrastructure
Post-Bid
$250,000 CJ est. value
Bend, OR 97703

Last Updated 07/25/2023 03:23 PM
Project Title

Cooley Talus Road Extensions

Physical Address View project details and contacts
City, State (County) Bend, OR 97703   (Deschutes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes demolition, grading, storm water facilities, water and sewer mains and services, lighting, landscaping, paving, traffic control, concrete curbs, flatwork, and franchise utility coordination and installation. The Project Manager for this project is: Eric Forster, 541-317-3040, email: eforster@bendoregon.gov. All technical questions should be directed to the Project Manager.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents