Similar Projects
Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Arcadia / Grammas Investments
New Construction, Infrastructure - 31,000 SF
Design
$20,000,000 CJ est. value
Union, KY 41091

Graeter's Ice Cream / Florence
New Construction, Infrastructure - 5,000 SF
Design
$1,320,000 CJ est. value
Florence, KY 41042

Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Bidding
$1,500,000 CJ est. value
Glasgow, KY 42141

Asphalt Pavement and Roadway Rehabilitation - KY Highway 36 (Ky 36)
Infrastructure
Bidding
$2,890,567 CJ est. value
Carrollton, KY 41008

New Park East Lane
Infrastructure
Post-Bid
Scottsville, KY

New Park East Lane
Infrastructure
Post-Bid
Scottsville, KY

Baseball Field Backstop Safety System
Results
Union, KY 41091

Dayton SRTS
Results
$191,962 est. value
Dayton, KY

New Hammond Heights Community Renovation
Renovation, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Fort Campbell, KY 42223

Bellevue Riverfront Project
New Construction, Infrastructure - 15,500 SF
Pending Verification
$115,000,000 CJ est. value
Bellevue, KY 41073

Address Pavement Condition of Louie B. Nunn Cumberland Parkway
Infrastructure
Conception
$4,400,000 CJ est. value
Glasgow, KY 42141

D-Crane Rental
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Walton, KY 41094

Partial Parallel Taxiway Project
Infrastructure
Bidding
$500,000 CJ est. value
Columbia, KY 42728

Last Updated 02/17/2023 07:42 AM
Project Title

Improve Safety, Congestion, and Pedestrian and Freight Mobility on US 42

Physical Address View project details and contacts
City, State (County) Warsaw, KY 41095   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $7,880,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improve Safety, Congestion, and Pedestrian and Freight Mobility on US 42 in Warsaw From Davis Drive to 0.4 Miles East of Dorman Drive. Mp 7.281-7.8. (16ccn) Milepoints: From MP 7.281 To 7.800 Purpose and Need: Safety(P) As of February 17, 2023, the project is in Conceptual status. Anticipated Letting Year is 2025. KYTC - Improve Safety, Congestion, and Pedestrian and Freight Mobility on US 42 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents