Similar Projects
Orange Lake Associates RV Resort Park
New Construction, Infrastructure
Conception
Citra, FL

Marion Oaks General Services Waterfall Surface Sealing Project
Infrastructure
Bidding
$40,000 est. value
Ocala, FL

North East Highway 314A (CR 314A) Resurfacing (from E SR 40 to North East Highway 314)
Infrastructure
Bidding
$4,246,656 est. value
Ocklawaha, FL 32183

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Supplemental Routine Maintenance - Ocala Operations and Leesburg Operations
Infrastructure
Post-Bid
Leesburg, Ocala, FL

US 27 at CR 225A Intersection Improvement
Results
Less than $4,681,000 est. value
FL

Asset Maintenance Marion County
Results
$17,701,000 est. value
FL

Asphalt Paving and Related Services, Term Contract
Term Contract
Bidding
Ocala, FL

Fore Acres First Addition Road Improvement Project
Infrastructure
Post-Bid
$415,000 est. value
FL

Ridgewood Park 1st, 2nd and 3rd Addition Road Assessment
Results
$250,000 est. value
FL

Southeast 17th Street (State Road 464) Force Main Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Ocala, FL 34471

Roosevelt Village Unit 1 - Road Improvement Project
Infrastructure
Post-Bid
$825,000 est. value
Ocala, FL

Edgewood Road Assessment Project
Results
$160,560 est. value
FL

Cedar Hills Combined MSTU Road Improvement and MCU Lift Station and Force Main Project
Renovation, Infrastructure
Post-Bid
$1,090,708 est. value
Ocala, FL

Emil-Marr Subdivision Road Improvement Project
Results
$240,000 est. value
FL

Last Updated 07/22/2022 03:31 AM
Project Title

Halfmile Creek Mitigation Area Trail Road Improvements

Physical Address View project details and contacts
City, State (County) Silver Springs, FL 34488   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $42,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project area is within the Halfmile Creek Tract in Marion County, FL, north of SR 40, east of CR 326, and west of CR 315 (address: 6381 E. Fl-326 Silver Springs, FL 34488). The elements of this project will provide stabilization of an interior road to allow access to the property for the planting and future fire management of the site. Several sections of the road become undrivable during the wet season. This work will maintain the current trail road system of the project and help reduce turbid discharge to Silver River. Special accommodations for disabilities may be requested through the Contracts Administrator or by calling (800) 955-8771 (TTY), at least five (5) business days before the date needed. Diversity. The District is committed to the opportunity for diversity in the performance of all procurements, and encourages its prime vendors (contractors and suppliers) to make good faith efforts to ensure that Woman and Minority-Owned Business Enterprises (W/MBE) are given the opportunity for maximum participation, as the second- and lower-tier participants. The District will assist its vendors (contractors and suppliers) by sharing information on W/MBEs to encourage their participation.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents