Similar Projects
Laurel Ridge Elementary School Major Building System Replacement
Renovation
Conception
Decatur, GA 30033

Woodridge Elementary School Major Building System Replacement
Renovation
Conception
Stone Mountain, GA 30083

Folkston Elementary School Classroom Addition
Addition, Demolition, Infrastructure - 87,598 SF
Bidding
$60,000 CJ est. value
Folkston, GA 31537

Needwood Middle, Golden Isles Elementary and Oglethorpe Point Elementary Modifications and Renovations
Renovation
Post-Bid
Brunswick, Saint Simons Island, GA 31525

Group B Fire Sprinkler Installation
Renovation
Post-Bid
$7,660,102 CJ est. value
Decatur, GA 30030

Matilda Harris Elementary School
Renovation
Results
Kingsland, GA

Crooked River Elementary School - Phase 1
Results
Saint Marys, GA 31558

Philadelphia Romanian Church
Addition - 14,285 SF
Construction
Lawrenceville, GA 30045

Davidson Fine Arts School Renovations and Additions Phase II
Renovation, Addition
Construction
$3,000,000 to $5,000,000 est. value
Augusta, GA 30901

Crossroads of Life Baptist Church
New Construction - 15,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Canton, GA 30114

Chesnut Elementary School Major Building System Replacement
Renovation
Conception
Atlanta, GA 30338

SSI ES New Construction Phase 2 - Steel and Concrete
New Construction
Post-Bid
Saint Simons Island, GA 31522

Lula Elementary Renovations and Roof
Renovation
Results
Lula, GA 30554

Athens Academy Daughtry Building Renovation
New Construction, Renovation, Demolition
Construction
Athens, GA 30606

Gracepoint School
Renovation - 30,000 SF
Conception
Marietta, GA 30060

Last Updated 11/15/2022 03:09 PM
Project Title

Renovations and Modifications at Bethlehem Elementary School, County Line Elementary School, and Winder Elementary School

Physical Address View project details and contacts
City, State (County) Bethlehem, GA 30620   (Barrow County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations and Modifications at Bethlehem Elementary School, County Line Elementary School, and Winder Elementary School 1. Demolition / Concrete / Masonry 2. Fencing & Gates 3. Structural & Misc. Steel 4. Architectural & Manufactured Casework 5. Doors / Frames / Hardware / Installation 6. Aluminum Storefront / Glass & Glazing 7. Drywall & Ceilings 8. Porcelain Tile & Base 9. Resilient Flooring, Base, Carpet 10. Interior & Exterior Painting 11. Athletic Wood 12. Specialties 3. Kitchen Equipment 14. Fire Protection 15. Plumbing 16. HVAC 17. Electrical 18. Fire Alarm 19. Classroom Audio, Safety & Intercommunication System Phase 1 (Summer 2023; May 27, 2023 - July 22, 2023) o Moving/Handling of Existing Furniture/Furnishings o Audio Enhancement Intercom System o Admin Area Demolition & Rebuild o Classroom Demolition & Rebuild (Room 1.020, 1.019, 1.018) o New Security Vestibule o Fire Alarm Replacement o All Resilient Flooring (VCT, Carpet, Walk-Off Carpet) - Including Demolition of existing flooring o Corridor Flooring at Admin Area Only o Rubber Base in All Areas other than Corridors o Interior & Exterior Painting (Except Corridors & Exterior EIFS) o Demolition of Risers & Handrails at Auditorium (Room 1.139) o Demolition of Gymnasium Bleachers o Dishwasher & Booster Heater Replacement o Exterior Fencing Replacement o Acoustical Wall Panels Phase 2 (Winter Break 2023; December 21, 2023 - January 06, 2023) o RTU Replacement at Gymnasium & Fabric Duct Installation o Serving Line Replacement Note: Additional work from "Phase 3" may take place during Phase 2 if coordinated with, and approved by, the Construction Manager Phase 3 (Summer 2024; May 25, 2024 - July 27, 2024) o Moving/Handling of Existing Furniture/Furnishings o Demo & Replace Corridor Ceilings o All HVAC Work (Except Admin Area completed in Phase 1) o All Plumbing Work (Except Admin Area & Dishwasher Replacement Completed in Phase 1) o Remove & Replace Cleanouts where indicated o All Electrical Work (Except Admin Area Completed in Phase 1) o Tie-Up all Existing Lights & Low Voltage Devices in Corridors where Ceilings are being replaced (Light Fixtures noted as EX) o Fire Protection/Sprinkler (Except Admin Area Completed in Phase 1) o Structural & Misc. Steel o Demo & Replace Corridor Flooring & Rubber Base (Include New Thresholds) o Interior & Exterior Painting o All Corridors, HM Frames (Interior & Exterior), HM Doors (Interior & Exterior), EIFS o Fire Alarm Work Associated with HVAC & Ceiling Replacement o Gymnasium Wood Flooring & Volleyball Sleeve Installation o Roof Patching (Allowance) o Sealcoat Asphalt Playcourts (Allowance) o Pressure Washing (Allowance) o New LED Message Centers (Allowance) Except as expressly provided in, or permitted by, the Proposal Documents, from the date of issuance of the RFP until final Board action of approval of contract award, the persons or entities submitting a Proposal shall not initiate any communication or discussion concerning the Project, the RFP or the Proposal or any part thereof with any employee, agent, or representative of the Owner. Any violation of this restriction may result in the rejection of the Proposal. The Owner reserves the right to reject any or all proposals, and to waive technicalities and informalities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents