Similar Projects
May Ck Trib 291A
Renovation, Term Contract
Design
WA

Airfield Electrical System Upgrade Phase III Construction Inspection
Renovation, Term Contract
Design
$150,000 est. value
WA

City Library Facilities Master Plan
Infrastructure
Bidding
Bellingham, WA

Rfq Multiple Engineering Service
Term Contract
Bidding

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

228th Avenue Overlay, from SE 8th Street to NE 8th Street
Infrastructure
Post-Bid
Sammamish, WA 98074

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Solid Waste Landfill Engineering Services (Operations)
Infrastructure
Bidding
WA

Cedar River Right Bank Revetment Repair
Alteration
Post-Bid
$1,012,151 est. value
WA

Construction Of The 2021 FTC Drill Tower
New Construction, Infrastructure - 2,000 SF
Results
$950,000 est. value
Walla Walla, WA 99362

Whitehorse Trail Design and Improvements
Infrastructure
Bidding
Everett, WA

Architectural and Engineering Services
New Construction
Post-Bid
Port Angeles, WA 98363

Historical Building Renovation and Structural Upgrade of URM
New Construction, Infrastructure
Results
Seattle, WA 98105

Regional A-E Environmental Services
Renovation, Term Contract
Bidding

Reported 11/23/2021 12:00 AM
Project Title

Design and Engineering Services for Electrical and Water System Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Salkum, WA 98582   (Lewis County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

CTTA is seeking a consulting team to provide Design and Engineering services for Electrical and Water System Infrastructure improvements throughout the park. The design will include improvements to the entire infrastructure of the park, to include services to each lot and block, all facilities such as: • Lodge that is 8505.5 Square feet on a 7500-gallon gravity septic system and includes to following: o Laundry facility four (4) washing machines and four (4) dryers. o Men’s Restrooms; three (3) toilets, two (2) urinals, two (2) Sinks and three (3) showers o Women’s Restrooms; four (4) toilets, three (3) Sinks four (4) showers o Kitchen serviced with gas oven/range and griddle, sink. • Swimming pool, 80,000 Gallons o Men’s Restrooms; four (4) toilets, two (2) urinals, two (2) Sinks two (2) showers o Women’s Restrooms; four (4) toilets, two (2) Sinks two (2) showers • Thirteen (13) Satellite Restrooms, consisting of separate men and women’s facilities. • Business office, serviced with water, power and private gravity septic system. • Maintenance shops, 720 Sq. ft. with power and 1,120 Sq. ft., with water and power.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents