Similar Projects
Concourse A Air Handling Unit (AHU)
Renovation
Sub-Bidding
$700,000 CJ est. value
Richmond, VA 23250

John Rolfe Middle School Kitchen HVAC Replacement
Renovation
Sub-Bidding
$3,000,000 CJ est. value
Richmond, VA 23231

Air Purifiers and Accessories
Term Contract
Post-Bid
Glen Allen, Henrico, Highland Springs, Sandston, VA 23059

Metro Hanger HVAC
Alteration
Post-Bid
Henrico, VA 23250

HVAC Services
Term Contract
Results

Preventive Maintenance and Repair Services of Water and Air Cooled Chillers
Term Contract
Results
$172,619 est. value
VA

HVAC Plenums
Term Contract
Post-Bid
Glen Allen, VA

Outside Air Unit Replacements at Five Schools
Alteration
Results
Glen Allen, Henrico, Richmond, VA 23060

Virginia Department of Transportation Central Materials Lab: Ventilation Improvement Project
Renovation
Post-Bid
$100,000 CJ est. value
Sandston, VA 23150

Outside Air Unit Replacements at Ridge ES and Springfield Park ES
Alteration
Results
Glen Allen, Henrico, VA 23233

Chiller at Freeman High School
Term Contract
Post-Bid
Richmond, VA 23229

Maintenance Shop Rooftop Unit Replacement
Alteration
Results
Richmond, VA 23250

Chiller at Moody Middle School
Renovation
Post-Bid
$60,000 CJ est. value
Richmond, VA 23228

MDF HVAC Replacement
Alteration
Results
Richmond, VA 23250

Maintenance Shop Rooftop Unit Replacement
Renovation
Post-Bid
$200,000 CJ est. value
Richmond, VA 23250

Last Updated 03/10/2023 05:03 PM
Project Title

Cooling Tower Maintenance

Physical Address View project details and contacts
City, State (County) Richmond, VA 23250   (Henrico County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $48,904 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide the maintenance and repair of (4) 700 ton Evapco cooling towers in accordance with the terms and conditions, and scope of work as described herein for the Capital Region Airport Commission. 1. Perform two (2) semi-annual service visits (April and October) to include the following a. Inspect the drift eliminators for debris, algae growth and proper position. Remove debris and clean the drift eliminators. b. Visually inspect the water distribution spray header and branches. Remove and clean the metering orifices. c. Clean debris from the wet deck with high pressure water spray and inspect for damage. d. High pressure spray air inlet louvers. e. Remove and clean sump strainers. f. Clean and flush cold water sump with high pressure water spray. g. Inspect the low water cut off switch and clean if necessary. h. Inspect heater elements for scale build up and inspect the junction box for loose wiring and moisture. i. Check heater elements for proper operation. j. Clean the outside surface of the fan motor and lubricate per the manufacturer’s recommendations. k. Inspect the general condition of the unit and check the condition of the interior and exterior protective finish. l. Check the centrifugal fans locking collars and hubs on propeller type fans. Inspect the fan blades for bent, broken and cracked blades. m. Check sheave alignments and adjust belt tension. n. Lubricate fan shaft bearings. o. Lubricate motor base adjusting screw. p. Inspect the condition of the insulation on the piping system and not any deficiencies. q. Check the unit for unusual noise or vibration. r. Check and adjust sump water levels in the cold water sump. s. Check the operation of the make-up water valve. t. Check the fan for proper rotation without any obstructions. u. Check and record motor voltage and amp draw. v. Inspect the interior and exterior for leaks. Repair all leaks. 2. Perform Ten (10) monthly service visits other than those listed above to include the following: a. Visually inspect the cold water sump for debris and cleanliness. b. Check the condition of the drift eliminators and verify that they are installed in the proper position. c. Visually inspect the PVC fill material in each tower. d. Check the water distribution and spray pattern. Remove and clean metering orifices if blockage is seen. e. Check fans, fan screens and air inlet louvers. Remove debris. f. Check for proper lubrication on the fan bearings and motor base adjusting screw. g. Check the motor and fan sheave alignment. h. Check and adjust fan belt tension. i. Check the vibration switches for proper operation. j. Clean the outside surface of the fan motor. k. Inspect the electrical and piping connections. Report any deficiencies. l. Check centrifugal fans locking collars and hubs on propeller type fan. Inspect the fan blades for bent, broken and cracked blades. m. Check the position of the strainer screens. Remove and clean. n. Check the operation of the makeup water valve and float assembly. Record the operating level in the cold water sump and adjust the float as necessary. o. Inspect the interior and exterior for leaks, repair all leaks. p. Check the unit for unusual noise and vibration. q. Check and record the motor voltage and amp draw. r. Report any operational problems or mal functions that may result in problems with the tower. 3. All visits to include a thorough inspection with a detailed report. 4. Coverage includes all labor, but excludes all parts except for normal consumables. Parts to be provided on a cost plus basis. 5. All work will be performed during normal working hours. 6. Small scale repairs to be performed on a time and material basis. Large scale repairs will be performed at a pre-determined fixed cost basis at the time of the required services. 7. All repairs parts are to be Evapco or Evapco approved parts. 8. Response time for emergency repairs to be less than 24 hours. For Cooling Tower Maintenance Provide the maintenance and repair of (4) 700 ton Evapco cooling towers

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents