Similar Projects
New Innovative Center & School Renovations
Renovation
Post-Bid
Carol Stream, IL 60188

North High School Master Facility Plan
Post-Bid
Downers Grove, IL 60515

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

East Building Addition Phase II & Field House Expansion
Renovation, Addition - 119,000 SF
Results
Lincolnshire, IL 60069

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

McHenry High School West Campus Addition and Renovations
Renovation, Addition - 64,000 SF
Results
Less than $44,000,000 est. value
McHenry, IL 60050

2021 Summer Renovations at West Oak Campus and Diamond Lake School
Renovation
Post-Bid
Mundelein, IL 60060

Orozco School Environmental Abatement
Renovation
Results
Chicago, IL 60608

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Disaster Recovery Services
Results

Fitness Addition - East Building Addition Phase II
Addition - 89,000 SF
Post-Bid
Lincolnshire, IL 60069

CM at Risk - Partial High School Replacement and Junior High School/High School Renovation
Renovation
Results
Toulon, IL 61483

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Disney II Magnet HS Convent Building Tuckpointing
Results
Chicago, IL 60602

Last Updated 09/17/2020 03:34 PM
Project Title

Accessibility and Miscellaneous Work at Mille Proegler School

Physical Address View project details and contacts
City, State (County) Kankakee, IL 60901   (Kankakee County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall take place at Millie Progler School The work includes, but is not limited to, removal and replacement of existing exterior concrete stair and Sidewalk, new accessible exterior and interior ramp, door and frame replacement, site work and all Other associated work The work also includes some remodeling of the main office and vestibule, new doors and frames and all associated mechanical and electrical work Work is to be awarded as a single contract. Refer to the Drawings and Project Manual for the full extent Of the Work.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents