Similar Projects
Traffic Signs
Term Contract
Bidding
Harrisburg, PA

Bus Stop Signage Installation Services
Post-Bid
$200,000 est. value
PA

Wayfinder/Dibond Signage
Term Contract
Post-Bid
Pittsburgh, PA

Installation of Pedestrian Crosswalks
Results
State College, PA

Breakaway Sign Posts and Assemblies
Results
Erie, PA 16500

Barrier Concrete 52 Double
Post-Bid
Harrisburg, PA 17106

New Digital Sign at The Westmont Hilltop Elementary School
Results
Johnstown, PA 15905

Outdoor Digital Sign Replacement for Chester County Library
Post-Bid
Exton, PA 19341

2019 Paving and Commerce Boulevard Striping Project
Results
Dickson City, PA 18519

Traffic Marking Compounds
Term Contract
Post-Bid
Philadelphia, PA 19102

Installation of Durable Pavement Markings
Results

Guide Rail Improvements Bridges 32C, 48A, 55B, and 73B
Results
Reading, PA 19600

Flares, Roadway Safety
Results
Everett, Gibsonia, Middletown, Plymouth, PA 15044

Bollard Project at High School and Elementary School
Results
Houtzdale, PA 16651

Roadway Line Striping
Results
Carlisle, PA

Last Updated 12/13/2019 05:54 AM
Project Title

Interstate Guide Rail Upgrade - 3-0

Physical Address View project details and contacts
City, State (County) PA   (Lycoming County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,500,000 to $9,999,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for upgrading existing guiderail and end treatments on Statewide Interstate System based on Manual for Assessing Safety Hardware (MASH) criteria in District 3. This project is to replace end treatments and substandard guiderail on the Interstate system (BPN1) to meet current acceptable standards and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 9999, Section GR2, in Various Counties and indicated on the plan set. 0203-0001 Cubic Yard 80.000 01 n c Class 1 Excavation 0205-0364 Ton 110.000 01** n c1 Selected Borrow Excavation Rock, Class r-4 0206-0010 Ton 26,284.000 01** n c1 Select Granular Material (2rc) 0608-0001 Lump Sum 1.000 01** n x Mobilization 0619-0459 Each 282.000 01** n j1, j3 Permanent Impact Attenuating Device, Type Ii, Test Level 3, Tangent (Mash) 0620-0400 Each 212.000 01** n j Terminal Section, Single 0620-0503 Linear Foot 170,263.000 01** n c1, j Remove Existing Guide Rail (Contractor`s Property) 0620-0575 Linear Foot 1,600.000 01** n j Guide Rail Element 0620-0872 Each 25.000 01** n j Buried-In-Backslope Terminal, Single Panel 0620-0873 Each 9.000 01** n j Buried-In-Backslope Terminal, Double Panel 0620-0900 Each 3.000 01** n c1, j Remove Concrete Anchorage 0620-1600 Linear Foot 164,861.000 01** n j Type 31-s Guide Rail 0620-1601 Linear Foot 11,350.000 01** n j Type 31-s Guide Rail With 7` Extra Length Posts 0620-1602 Linear Foot 650.000 01** n j Type 31-s Guide Rail With 8` Extra Length Posts 0620-1625 Linear Foot 1,238.000 01** n j Type 31-Sc Guide Rail 0620-1626 Linear Foot 275.000 02** n j Type 31-Sc Guide Rail With 7` Extra Length Posts 0620-1635 Linear Foot 200.000 02 n j Type 31-Scc Guide Rail 0620-1637 Linear Foot 150.000 02 n j Type 31-Scc Guide Rail With 7` Extra Length Posts 0620-1640 Linear Foot 700.000 02 n j Type 31-Sm Guide Rail 0620-1660 Each 212.000 01** n j Type 31-Strong Post Anchor Terminal 0689-0001 Lump Sum 1.000 01 n x Narrative Schedule 0690-0001 Dollar 1,000.000 $1.00 $1,000.00 01 y x Internal Facilitation 0901-0001 Lump Sum 1.000 01** n q Maintenance And Protection Of Traffic During Construction 0937-0117 Each 115.000 01** n j, r Guide Rail Mounted Delineator Type b, (y/r) 4937-0117 Each 1,304.000 01** n Yes j, r Proj Guide Rail Mounted Delineator Type b, (y/r) (Remove And Reset) 0937-0118 Each 219.000 01** n j, r Guide Rail Mounted Delineator Type b, (w/r) 4937-0118 Each 1,627.000 01** n Yes j, r Proj Guide Rail Mounted Delineator Type b, (w/r) (Remove And Reset) 0937-0121 Each 115.000 01** n j, r Guide Rail Mounted Delineator Type d, (y/r) 4937-0121 Each 1,304.000 01** n Yes j, r Proj Guide Rail Mounted Delineator Type d, (y/r) (Remove And Reset) 0937-0122 Each 219.000 01** n j, r Guide Rail Mounted Delineator Type d, (w/r) 4937-0122 Each 1,627.000 01** n Yes j, r Proj Guide Rail Mounted Delineator Type d, (w/r) (Remove And Reset) 8910-0001 Lump Sum 1.000 07 n x Std Permits For Design-Build Projects 9000-0001 Linear Foot 171,741.000 01** n c1 Proj Grade Excess Material

Details

Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents