Similar Projects
Crack Sealing of Bituminous Concrete Pavement
Bidding
Newington, NH

Paving
Bidding
Hampton, NH

Roadway Preservation on Various Roadways
Post-Bid
Less than $1,227,623 est. value

Pavement Preservation from MM 115.2 to MM 124.6 Including Ramps from Exit 6 to Exit 9
Results
Less than $5,639,355 est. value
Epping, Exeter, NH 03042

2020 Crack Sealing Project
Results
Hampstead, NH

Roadway Pavement Crack Sealing
Bidding
Less than $20,000 est. value
Hampton, NH

Pavement Resurfacing in District 5 and 6
Results
Less than $4,742,960 est. value
Allenstown, Amherst, Atkinson, Auburn, Barnstead, Barrington, Bedford, Boscawen, Bow, Brentwood, Brookline, Candia, Canterbury, Chester, Chichester, Concord, Deerfield, Derry, Dover, Dunbarton, Durham, Epsom, Goffstown, Hampstead, Henniker, Hollis, Hooksett, Hopkinton, Hudson, Litchfield, Londonderry, Manchester, Merrimack, Milford, Mont Vernon, Nashua, New Boston, New London, Northfield, Pelham, Pembroke, Pittsfield, Raymond, Salem, Sandown, Sutton, Tilton, Warner, Weare, Webster, Windham, NH 03811

Pavement Resufacing in Districts 4, 5 and 6
Bidding

2020 Paving Projects
Results
Windham, NH

Roadway Paving
Bidding
Newington, NH

Pavement Resurfacing in District 6
Results
Less than $3,168,955 est. value
Atkinson, Barnstead, Barrington, Brentwood, Danville, Deerfield, Dover, Durham, East Kingston, Epping, Epsom, Exeter, Farmington, Fremont, Greenland, Hampstead, Hampton, Hampton Falls, Kensington, Kingston, Lee, Madbury, Middleton, Milton, New Castle, Newfields, Newington, North Hampton, Northwood, Nottingham, Pittsfield, Plaistow, Portsmouth, Raymond, Rochester, Rollinsford, Rye, Sandown, Seabrook, Somersworth, South Hampton, Strafford, Stratham, Union, NH 03811

VCK Apartment Paving
Bidding
Derry, NH 03038

Resufacing Various Tier 2 Roadways in District 2
Results
Less than $2,308,737 est. value

Parking Lot and Walkways Repaving
Results
Hampton Falls, NH

2020 Roadway Improvement Project - Industrial Way and Emery Road
Results
Salem, NH

Last Updated 02/17/2020 10:01 AM
Project Title

2020 Road Improvements/Asphalt

Physical Address View project details and contacts
City, State (County) Atkinson, NH   (Rockingham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2020 Road Improvements using approximately 5,101 tons of asphalt. Shim and Overlay the following roads: Millstream Drive, Woodlock Park Lane, Rose Lane, Salem Road, Fieldstone Lane, Sunny Meadow Road, Stonewall Terrace, Oakridge Drive, Deer Run Road, Abbey Lane and Brushwood Drive. Placement of tack emulsion meeting the State of New Hampshire Specifications for Road and Bridge Construction, applied at the rate of 1/20th gallon per square yard; Estimated tonnage of 5,101. ½- to 1-inch shim, and a minimum of one inch overlay of 3/8-inch bituminous concrete meeting New Hampshire Department of Transportation (NH DOT) specification mix, graded and compacted to a density of 95%, using a series of rollers (including at least one rubber-tired roller), subject to approval by the Road Agent.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents