Similar Projects
New Orleans Sidewalk Improvements Aspen to Elm
New Construction, Infrastructure
Bidding
Broken Arrow, OK 74011

Sidewalk and Curbramp Construction for CDBG/HUD Grant
Infrastructure
Bidding
Tulsa, OK 74107

Sidewalk - Glenn Curlee Park - Installation
Infrastructure
Post-Bid
Lindsay, OK 73052

Resurface the Parking Lots at MacArthur Middle and Eisenhower High Schools
Infrastructure
Post-Bid
Lawton, OK 73507

Pedestrian Improvements (Trail Construction)
Results
OK

Pedestrian Improvements (Trail and School Zone)
Results
Midwest City, OK 73130

On Call Citywide Sidewalk
Term Contract, Infrastructure
Bidding
Less than $2,000,000 est. value
Lawton, OK

Pedestrian Improvements Streetscape
Infrastructure
Post-Bid
Waynoka, OK

Pedestrian Improvements (Trail Construction)
Results
Yukon, OK 73099

PH V - USA Softball Hall of Fame Trail
New Construction, Infrastructure
Bidding
$1,600,000 est. value
Oklahoma City, OK

Martin Luther King Center Parking Lot Project
Infrastructure
Post-Bid
$300,000 to $400,000 est. value
Muskogee, OK

Grade, Drain, and Surface County Roads (NS-393/EW-123) from the SH-9 Junction Extend South on NS-393 then East On EW-123 Near Dustin
Results
OK

Jackson Park Restroom and Parking Lot Expansion
Renovation, Infrastructure
Bidding
Broken Arrow, OK 74012

Chattanooga School Streets and Parking Lots Project in District 3
Infrastructure
Post-Bid
Lawton, OK

Pedestrian Improvements (Sidewalks)
Results
OK

Last Updated 11/19/2021 04:48 AM
Project Title

Pedestrian Improvements (Trail Construction) Bixby East Fry Trail

Physical Address View project details and contacts
City, State (County) OK   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pedestrian Improvements (Trail Construction) Bixby East Fry Trail: From 131st Street, Extend North and East in the City of Bixby. Project Length = 2.68 Miles Section 0001 - Roadway 0010 201(a)1200 Clearing and Grubbing 1.00 Lsum 0020 202(a)2200 Unclassified Excavation 1,477.00 Cy 0030 202(D)2500 Unclassified Borrow 692.00 Cy 0040 205(a)6200 Type a-salvaged Topsoil 1.00 Lsum 0050 221(B)2300 Temporary Silt Fence 13,691.00 Lf 0060 227 4100 (Sp)turf Reinforcement Mat 78.00 Sy 0070 230(a)7200 Solid Slab Sodding 7,799.00 Sy 0080 240(a)2200 Removing Trees 6" to 12" in Diameter 17.00 Ea 0090 310(B)5300 Subgrade, Method B 11,336.00 Sy 0100 411(C)1430 Superpave, Type S4(Pg 64-22 Ok) 2,547.00 Ton 0110 509(a)0200 Class Aa Concrete 364.00 Cy 0120 509(D)0500 Class C Concrete 73.00 Cy 0130 510(a)1200 Retaining Wall 214.00 Sy 0140 510(C)1400 Slope Wall 157.00 Sy 0150 511(a)2200 Reinforcing Steel 2,597.00 Lb 0160 601(B)1200 Type I Plain Riprap With Filter Blanket 25.00 Ton 0170 609(B)4310 Combined Curb & Gutter(6" Barrier) 50.00 Lf 0180 610(a)5200 4" Concrete Sidewalk 680.00 Sy 0190 610(B)5320 8" Concrete Driveway 40.00 Sy 0200 610(I)6000 Tactile Warning Device-new 40.00 Sf 0210 611(G)0362 Inlet (Smd-type 2b) 1.00 Ea 0220 619(a)6200 Removal of Structures & Obstructions 1.00 Lsum 0230 619(B)6356 Removal of Curb and Gutter 110.00 Lf 0240 619(B)6380 Removal of Concrete Driveway 88.00 Sy 0250 619(B)6396 Removal of Guardrail 150.00 Lf 0260 619(B)6404 Removal of Sidewalk 176.00 Sy 0270 619(B)6408 Removal of Concrete Slope Protection 244.00 Sy 0280 622(a)0200 Pipe Railing 404.00 Lf 0290 623(F)1764 Guardrail Trail End Turndown (31") 2.00 Ea 0300 623(I)2030 Guardrail Bridge Conn-trail End (31") 2.00 Ea 0310 631(a)9210 (Sp)removable Bollard 4.00 Ea 0320 632 0100 (Pl) Sitescaping 1.00 Lsum Section 0002 - Bridge 'a' 0330 501(B)1300 Substructure Excavation Common 240.00 Cy 0340 501(F)1700 Granular Backfill 50.00 Cy 0350 509(B)0320 Class a Concrete 23.00 Cy 0360 511(a)2210 Reinforcing Steel 1,620.00 Lb 0370 535 7170 Prefabricated Pedestrian Bridge 1.00 Ea Section 0003 - Traffic 0380 836 7100 Regulatory or Warning Sign Assembly 4.00 Ea 0390 850(a)1200 Sheet Aluminum Signs 95.00 Sf 0400 851(C)2410 1 3/4" Square Tube Post 209.00 Lf 0410 856(a)8200 Traffic Stripe(Multi-poly.)(4" Wide) 2,892.00 Lf 0420 856(a)8216 Traffic Stripe(Multi-poly.)(24" Wide) 192.00 Lf 0430 880(B)6300 Construction Signs 0 to 6.25 Sf 1,110.00 Sd 0440 880(B)6320 Construction Signs 16.0 Sf to 32.99 Sf 510.00 Sd 0450 880(C)6410 Construction Barricades(Type Iii) 120.00 Sd 0460 880(F)6700 Drums 870.00 Sd Section 0004 - Staking 0470 642(B)3300 Construction Staking Level Ii 1.00 Lsum Section 0005 - Construction 0480 220 1100 Swppp Documentation and Management 1.00 Lsum 0490 641 2110 Mobilization 1.00 Lsum

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents