Project Title | Paving and Utility Rehab/Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | Fargo, ND 58102 (Cass County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,344,639 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Project is using SRF Loan Funds and Federal Funds and there are additional terms and conditions required to comply with the contract specifications. Please confirm all requirements are met and documents are included with your bid. This Project will comply with SRF and Federal requirements. In the event of a discrepancy between City of Fargo contracting requirements and SRF and Federal contracting requirements, the SRF and Federal contracting requirements shall prevail. BR-24-C1 of the following: South Woodcrest Drive North from Lilac Lane North to Willow Road North & North Woodcrest Drive North from Willow Road North to Lilac Lane North. Bids shall be on the basis of cash payment for work performed. Bidders are required to comply with Davis-Bacon prevailing wage requirements. All bidders should be advised that if awarded, the Contractor shall comply with the (i) American Iron and Steel requirements; (ii) Civil Rights requirements; (iii) Equal Employment Opportunity requirements; (iv) create an affirmative action plan; (v) provide evidence of compliance with the Disadvantaged Business Enterprises (DBE) participation; (vi) and provide evidence of compliance with the Davis Bacon Act as more fully set forth in the Contract. All of the foregoing is located in the City of Fargo, Cass County, North Dakota. Lots 16 through 30, Block 2, Inclusive. Lots 1 through 15, Block 3, Inclusive. All in the Van Raden's 2nd Addition. The existing water main on 1st Street is ACP, which was installed over 50 years ago, is being replaced to minimize impacts and costs associated with breaks. As part of this, we will replace the water main services to the curb stop and the sanitary services from the main to behind the curb. The street reconstruction is necessary because the existing street section has deteriorated significantly and has exceeded it's life expectancy. Reconstruction will include asphalt street paving, gravel base, curb and gutter, storm sewer inlets and leads, driveway approaches, sidewalk, and streetlights. If you have any questions concerning the shut down, please contact one of the following: 1. Contractor at construction site 3. Engineering Department 241-1545 4. Mains and Hydrants 241-8174 |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |