Similar Projects
Max N. Rhoads Water Reclamation Facility Improvements
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Owensboro, KY 42301

Deck Replacement and Drainage Remediation
Infrastructure
Bidding
$40,000 CJ est. value
Paintsville, KY 41240

WWTP 2 - Carbon Filter System Pipe Gallery Painting and Valve Replacement
Alteration
Post-Bid
Georgetown, KY 40324

Plumbing Service and Repair
Term Contract
Post-Bid
Lexington, KY

Clay Hall Shower Pan Replacement
Alteration
Results
Richmond, KY 40475

Calloway County Public Library
Renovation, Addition
Results
Murray, KY 42071

Grade & Drain With Asphalt Surface
Infrastructure
Bidding
$300,000 CJ est. value
Philpot, KY 42366

Grease Trap And Septic Tank Services
Term Contract, Alteration
Post-Bid
Lexington, KY

HSB HVAC and Piping Phase 2
Alteration
Results
$1,890,000 est. value
Frankfort, KY

Maintenance, Repair and Operations (MRO) Trade Services
Renovation, Alteration
Post-Bid
Lexington, KY

Town Branch Scum Facility Improvements
Renovation, Alteration
Results
Lexington, KY 40504

USACE Replace Waste Piping B Mechanical, Ft. Campbell
Infrastructure
Post-Bid
$250,000 est. value
Fort Campbell, KY 42223

UKGS C207F Sink Installation
Renovation, Alteration
Results
$157,000 est. value
Lexington, KY 40508

Water Hammer Control Upgrade
Alteration
Results
Less than $30,000 est. value
Lexington, KY

Franklin County Career & Technical Center - Welding Lab Improvements
Renovation
Results
$60,000 est. value
Frankfort, KY 40601

Last Updated 10/17/2022 05:03 PM
Project Title

Derek R. Guthrie Water Quality Treatment Center (DRGWQTC) RAS Pump Nos. 2 and 3

Physical Address View project details and contacts
City, State (County) Louisville, KY 40272   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,979,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 17,2022, this project has not yet been awarded. A timeline for award has not yet been established. Description and location of Project: The DRGWQTC RAS Pump Nos. 2 and 3 Replacement project includes: Removal and replacement of the existing RAS Pump Nos. 2 and 3 and the associated piping, valves, drains, motors with concrete pad, electrical and controls, and concrete pump pedestals. Also, repair of a concrete support beam and MCC replacement are included in the project. The project is located at the Derek R. Guthrie Water Quality Treatment Center (DRGWQTC) at 1 1601 Lower River Road , Louisville, Kentucky 40272. All work shall be done in accordance to MSD's Standard Specifications. The Project Manager for this Invitation to Bid is Steven Leong.. All inquiries and questions prior to the bid opening shall be Directed , in writing, to MSD's Project Manager, Steven Leong. at steven.leong@louisvillemsd.org. Questions received less than five days prior to the date for opening of bid s may not be answered . Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E. If selected as applicable below , the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0%of the total amount of the Contract Bid price to certified Asian-Indian American minority-owned businesses , and at least 15.0%total amount of the Contract Bid price to certified Caucasian Female businesses. The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid. MBE and WBE businesses are encouraged to bid on this project as a prime contractor. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor shall commence the Work and shall achieve Substantial Completion of the Project in accordance with the requirements of the Contract within 670 consecutive calendar days The Engineer’s Construction Cost Estimate for this project is between $ 4,000,000.00 and $ 5,000,000.00 .

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents