Similar Projects
Caley Pond Improvements - City of Greenwood Village
Infrastructure
Conception
$325,000 CJ est. value
Greenwood Village, CO 80121

Caley Pond Improvements - City of Greenwood Village
Infrastructure
Conception
$325,000 CJ est. value
Greenwood Village, CO 80121

Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Murphy Creek Parcel 3E South
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Aurora, CO 80011

RFP - Construction Consultant: Estimation, Project Management and Construction
Demolition, New Construction, Infrastructure
Bidding
Aurora, CO 80011

North Campus Horizontal Well Project
Infrastructure
Bidding
$800,000 CJ est. value
Aurora, CO 80011

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

Erosion Control and Stormwater Management Contractor
Infrastructure
Post-Bid
Aurora, CO

Retaining Wall Installation Project
Results
Less than $100,000 est. value
CO

Crossroads Overlot Grading
Results
Greenwood Village, CO

Englewood Station Apartments
New Construction, Infrastructure
Construction
$83,000,000 CJ est. value
Englewood, CO 80110

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

King Soopers Fuel at Arapahoe Crossing
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80016

Living Water Express Car Wash
New Construction, Infrastructure
Design
$750,000 CJ est. value
Aurora, CO 80012

Joint Cryptologic Center (JCC) Building
New Construction, Infrastructure - 30,000 SF
Bidding
$100,000,000 CJ est. value
Aurora, CO 80011

Last Updated 02/06/2023 01:05 PM
Project Title

Goldsmith Gulch - Downstream of Berry - City of Greenwood Village

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO 80111   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $165,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The low flow channel downstream of Berry Ave is experiencing degradation causing steep vertical banks. The project consists of installation of boulder edging for bank stabilization and erosion caused by a utility access structure. The project includes anticipated funding from the Mile High Flood District, previously UDFCD. As of February 6, 2023, this project is included in the City of Greenwood Village 2023 - 2027 Capital Improvement Plan (CIP) and funding for construction is allotted for 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents