Similar Projects
Piper Lake North
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Kansas City, KS 66109

The Madison
New Construction, Infrastructure
Design
$90,000,000 CJ est. value
Kansas City, KS 66104

Inland Drive Automotive Repair Shop
New Construction, Infrastructure - 4,800 SF
Design
$1,000,000 CJ est. value
Kansas City, KS 66106

RFP D/B - Sumner Academy Athletic Field Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Kansas City, KS 66101

Connor Creek Tributary Interceptor Improvements
Infrastructure
Bidding
$4,250,000 CJ est. value
Kansas City, KS 66101

Turner`S Logistic Center West
New Construction
Post-Bid
Kansas City, KS

2022 On-Call Restoration Services for Pipeline Repairs
Term Contract
Post-Bid
Bonner Springs, KS

Wyandotte County Water Line - Phase V
Results
$475,000 to $650,000 est. value
Kansas City, KS

Pump Station 4 Force Main Realignment
Renovation
Results
$500,000 to $600,000 est. value
Kansas City, KS

Village West Apartments III
New Construction, Infrastructure
Construction
$120,000,000 CJ est. value
Kansas City, KS 66109

Fairfield Inn & Suite Marriott / Kansas City
New Construction, Infrastructure - 68,242 SF
Pending Verification
$15,000,000 CJ est. value
Kansas City, KS 66111

West 39th Avenue Apartments
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Kansas City, KS 66103

Primrose Schools / Kansas City
New Construction, Infrastructure - 12,550 SF
Design
$2,600,000 CJ est. value
Kansas City, KS 66103

2022 On-Call Pipeline Repair Services Rate Request
Term Contract
Post-Bid
Bonner Springs, KS

RFQ Armourdale Industrial District Pump Station Improvements Construction Manager At-Risk Services
Renovation
Results
Kansas City, KS 66118

Last Updated 01/24/2023 02:08 AM
Project Title

93rd Street (Gravity and Force Main Sanitary Sewer)

Physical Address View project details and contacts
City, State (County) Kansas City, KS 66109   (Wyandotte County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described to include but not limited to installation of lift station and 72-diameter concrete wet well, boring a 12 steel casing under Woodend Road, construction of new 4 sanitary force main, 8 gravity sewer main, fence, gates, and other improvements in Edwardsville, KS. Direct all questions to Randy Gorton at 93rd Street (Gravity and Force Main Sanitary Sewer) - Edwardsville, KS PreBid Date: Not furnished Bid Bond: 5% The bidder to whom a contract for the Work is awarded will be required to furnish performance, warranty, and statutory bonds acceptable to the City of Edwardsville, Kansas, each in amount of one hundred percent (100%) of the Contract, in conformity with the requirements of the proposed Contract Documents. Each bond shall be written by an agent having an established office in Kansas. Completion Date: 200 Consecutive Calendar Days.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents