Similar Projects
Ambassadors for Jesus Arabic Evangelical Church
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Clifton, VA 20124

Dar Alnoor Expansion
Renovation, Addition - 76,276 SF
Conception
Manassas, VA 20122

Dale City Moose Lodge
New Construction - 15,424 SF
Design
$1,000,000 to $1,500,000 est. value
Dale City, VA 22193

United Community Of Muslims
New Construction - 10,000 SF
Design
$2,000,000 to $3,000,000 est. value
Lorton, VA 22079

St. Pope Cyril Coptic Orthodox Church
New Construction - 19,000 SF
Post-Bid
$2,000,000 est. value
Aldie, VA 20105

Elk's Lodge Restrooms
Renovation
Post-Bid
Accomac, VA 23301

Cardinal Village Community Center
New Construction - 6,000 SF
Results
Danville, VA 24541

Keswick Senior Apartments
New Construction - 709,355 SF
Construction
$16,000,000 est. value
Spotsylvania, VA 22551

Carter's Mill
New Construction
Construction
Haymarket, VA 20137

37 North at Fort Monroe
New Construction, Renovation
Pending Verification
$40,000,000 est. value
Hampton, VA 23669

Juniper Hill Commons
New Construction, Renovation
Conception
Harrisonburg, VA 22801

Cedera - Age Restricted Community
New Construction
Design
Chesapeake, VA

Mount Hermon Village Senior Apartments
Renovation - 61,766 SF
Post-Bid
Portsmouth, VA

Grace United Methodist Church Addition
Addition - 11,696 SF
Construction
$1,000,000 to $1,000,500 est. value
Manassas, VA 20110

Montebello Farms
New Construction
Conception
Sterling, VA 20164

Last Updated 06/25/2021 02:40 PM
Project Title

Church of Latter Day Saints Temple

Physical Address View project details and contacts
City, State (County) Glen Allen, VA   (Henrico County)
Category(s) Entertainment/Recreation, Religious/Funeral
Sub-Category(s) Clubhouse/Social Club, Religious Facility
Contracting Method
Project Status Construction Commenced August 2020, Construction Completion Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Temple will be 36,000 square foot, two story building and a 16,000 square foot meeting house. the plans include a 151-foot tower topped with a statue of the Angle Moroni.

Details

52,000 SF - 1 Religious Facility, 2 Stories Above Grade, 36,000 SF New Construction, 1 Clubhouse/Social Club, 16,000 SF New Construction, 11 Acres, 240 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents