Similar Projects
Construction of Lago Mar Pod 3 Detention, Pod 4 Detention & Channel Revision
Bidding
TX

Phase II Detention Improvements and Mass Grading for Sunset Grove Sections 3, 4, 5, & 6 & Partial Ambrose Section 1 and Ditch 9G Improvements
Bidding
TX

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX 77591

14th Street Ditch Improvements
Post-Bid
Texas City, TX 77590

Water, Sanitary, and Drainage Facilities in Lago Mar Pod 5 Section 1
Results
Less than $1,096,990 est. value
TX

Landing Ditch Improvements at FM 518
Results
Less than $550,000 est. value
League City, TX

Sedona Section 7 Detention
Bidding
TX

Sabine Pass to Galveston Bay Port Arthur & Vicinity Contract 2
Post-Bid
$20,000,000 est. value
Galveston, TX

Bacliff Villas Drainage Restoration
Results
Less than $800,000 est. value
Galveston, TX 77550

Reinforced Concrete Pipe, Curb Inlets, Catch Basins, and Joint Sealer Annual Contract
Term Contract
Bidding
Texas City, TX

Canal System Restoration, Project Site Group I
Post-Bid
Texas City, TX 77591

Legas Drive Bulkhead
Results
$236,169 est. value
Galveston, TX 77550

Deer Ridge Buyout and Overland Flow Improvements
Bidding
$2,700,000 est. value
League City, TX 77573

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX

9th and 11th Avenue Drainage Restoration
Results
Less than $400,000 est. value
Galveston, TX 77550

Last Updated 10/07/2020 01:39 PM
Project Title

Repair Sabine Pass to Galveston Bay, Galveston County, Texas

Physical Address View project details and contacts
City, State (County) Galveston, TX 77554   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: 1) Sabine Pass to Galveston Bay, Texas Port Arthur & Vicinity Coastal Storm Risk Management Project Jefferson County, Texas PAV01 Levee Raise Station 877+00 to 933+15. The scope of work includes of a BASE Schedule and OPTION 1 to reconstruction and raising approximately 1.1 miles of levee embankment on the Port Arthur and Vicinity levee system. The reconstruction and raising will entail partial excavation of the existing embankment, testing and proper disposal of all excavated materials, stripping of embankment slopes, use of deep mixing methods, placement of fill to reconstruct and raise the levee, placement of turfing over the newly constructed embankment, installation of embankment monitoring equipment, replacement of the all-weather access road on top of the levee and replacement of existing ramps from the top of levee to the adjacent property on the interior of the levee system. Temporary flood protection will be required as this project is improving an existing coastal storm risk management project. Utilities within the work area are poles for a security line, adjacent gravel road and pipelines crossing the levee. The work will be within an industrial facility, which will require all safety and security requirements of the property owner's facility to be followed, in addition to all USAGE safety requirements. 2) Port Arthur Hurricane Flood Protection Project (HFPP) Harvey Repairs in Jefferson County, Texas. OPTION 2 will consist of repairing levee embankment slope failures in the city of Port Arthur, Texas. There are 5 different locations for the levee embankment slope failures all located within a 10 mile radius. This work will include removing existing disturbed soil from the levee and rebuilding the slope following moisture and compaction specifications. A portion of the existing disturbed soil will not be reused in the reconstruction of the levee, but instead disposed of following any federal/state laws. Any additional soils needed to complete the final grading will be transported to site from commercial barrow source. The reconstructed levee surface will then be sodded to restore vegetation coverage.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents