Similar Projects
Last Updated | 06/23/2023 07:31 AM |
Project Title | Remediation of Soil and Groundwater |
Physical Address | View project details and contacts |
City, State (County) | Trenton, NJ 08638 (Mercer County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Military Facility, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $377,450 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Trenton is issuing this Invitation to Bid to remediate light non-aqueous phase liquids (LNAPL) occurring in soil and groundwater at the former Federated Metals Site, located at 300 Enterprise Avenue in Trenton (the site). The City of Trenton conducted substantial remedial investigations and remedial actions at the site under NJDEP oversight circa 2007 through 2022. A substantial remedial action and post-remediation remedial investigation in 2022 has found that: 1) LNAPL remains in the subsurface as shown on Figure 2 (Attachment A). 2) LNAPL exists in the existing pond created by the prior remedial action; and 3) The recent investigation found that saturated soil samples collected at the bottom of the existing pond now meets the NJDEP cleanup criteria of 8,000 mg/kg, although the pond continues to require LNAPL removal from the water surface. The presumed area of residual LNAPL impact is found in Attachment A. The impacted area also includes part of an adjacent lot also owned by the City of Trenton. The City retains responsibility for the removal of LNAPL from this site and closure of the case through engineering and institutional controls although the City is not the responsible party in this case. The Licensed Site Remediation Professional (LSRP) Question Deadline 05/29/2023 Bid(10.0%), Performance(100.0%), Payment, Materials & Labor, Maintenance(100.0%), Certified Check Completion of project: One (1) Year |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |