Similar Projects
Waterline Replacement
Bidding
$25,000 to $100,000 est. value
WV

Wilson Ridge Waterline Extension Phase 2
Infrastructure
Bidding
$463,000 est. value
Birch River, WV

Right Fork Water Line Extension Project
Post-Bid
Danville, WV

Blennerhassett Condensing Water Piping Replacement
Post-Bid
Parkersburg, WV

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

University Avenue Water Line Horizontal Directional Drill Project
Infrastructure
Bidding
$200,000 est. value
Morgantown, WV 26501

Water Meter Improvements - Central Boaz Public Service District
Post-Bid
Vienna, WV

Tyler County Public Service District's Ben's Run Line Relocation
Results
Less than $55,000 est. value
Sistersville, WV

Water Infiltration Elimination and Construction at Morgantown High School
New Construction, Infrastructure
Post-Bid
Morgantown, WV

Downtown Water Main Replacement
Results
Wheeling, WV

Beartown Herndon Heights Waterline Extension Project
Infrastructure
Post-Bid
Stephenson, WV

Potable Water System Improvements
Results
New Cumberland, WV

Water Meters
Infrastructure
Post-Bid
Sistersville, WV

Distribution System Improvement Project
Results
Less than $2,350,000 est. value
WV

Last Updated 05/03/2022 11:51 AM
Project Title

Centerville Alma Water Extension

Physical Address View project details and contacts
City, State (County) WV   (Tyler County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,437,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACT #1 – Centerville Alma Water Extension: Unit price contract to construct approximately 21,230 LF of 8", 19,215 LF of 6”; 4,160 LF of 4”, 6,660 LF of 3”, 3,020 LF of 2" waterline, 531 feet of highway borings, 1,355 feet of horizontal directional drilling, 30 valves, 14 fire hydrants, 9 flushout assemblies, 150 meters and meter settings, 2 tie-ins to existing mains, 75 gpm Booster Station; and other work required to provide a complete operating water system. CONTRACT #2 – Water Storage Tank: Lump sum contract to construct one (1) water storage tank measuring 25 feet in diameter by 33 feet in height to the overflow with a nominal volume of 122,000 gallons. Contract also includes access road and appurtenances to make a complete operating system.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents