Similar Projects
Clark High School - Fine Arts Replacement- 2022 Bond - Northside Independent School District
New Construction, Renovation, Infrastructure
Conception
$56,900,000 CJ est. value
San Antonio, TX 78249

Roof Top Unit Replacements (5 sites) - 2022 Bond - Northside Independent School District
Infrastructure
Conception
$9,400,000 CJ est. value
San Antonio, TX 78205

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

SOFTBALL FIELD UPGRADE
Infrastructure
Design
$300,000 CJ est. value
San Antonio, TX 78224

Westlakes FM 143 Water Main Extension
Infrastructure
Bidding
San Antonio, TX 78252

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2018 Street Bond Projects - Phase II
Infrastructure
Post-Bid
$1,900,000 CJ est. value
Kirby, TX 78219

Emergency Response Road Improvment (Perimeter Road Package 4) (San Antonio International Airport)
Infrastructure - 109,555 SF
Results
$2,325,718 CJ est. value
San Antonio, TX 78223

Abbott Road Lift Station 2 Construction
New Construction
Results
$2,121,632 est. value
Converse, TX 78152

Package 2 SAWS NE Operation Center and NE Service Center
New Construction, Infrastructure
Construction
$250,000 CJ est. value
San Antonio, TX 78205

Refuel / San Antonio
New Construction, Infrastructure - 4,769 SF
Construction
$1,400,000 CJ est. value
San Antonio, TX 78254

Alamo Visitor Center and Museum
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
San Antonio, TX 78205

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Springhill Suites by Marriott / San Antonio North
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
San Antonio, TX 78205

RCCG Salvation Center San Antonio / 1406 Pinn Road
New Construction, Infrastructure - 30,700 SF
Design
$2,500,000 CJ est. value
San Antonio, TX 78227

Last Updated 09/29/2023 12:35 AM
Project Title

Classen Steubing New Bore Alignment - Outreach

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $6,991,222 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SJ Louis Construction of Texas Ltd was awarded this as of 9/18/2023. This project will install approximately 1,550 linear feet of 30-inch sewer pipe, 110 feet of 8-inch sewer pipe, and eliminate two lift stations: #150 and #191. This project includes trenchless installation under a SARA earthen dam and extension of existing sewer main along Hwy 281. This will increase capacity to better serve the area. Construction is planned to begin in the 3rd or 4th quarter of 2023. Estimated construction duration is 12 months, and estimated construction cost is $5.8 million. Construction Elements: Installation of approximately 110 LF of 8-inch and 1,550 LF of 30-inch gravity sewer at depths up to 35-ft in limestone rock via opencut and trenchless methods Involves trenchless excavation underneath a SARA earthen dam Elimination of two lift stations Coordination with SARA, CoSA, TXDoT and other stakeholders The design engineer is Pape Dawson Engineers, Inc. The work is in a flood way and within EARZ. For more information: SAWS Contract Administration contracting@saws.org 210-233-3341 This is for the purpose of notifying vendors of this upcoming project. No bid documents are available at this time. The method of Contractor Selection has not been Determined at this time

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents