Similar Projects
Last Updated | 04/29/2021 03:42 PM |
Project Title | Gerrardstown Pump Station, Forcemain and Wastewater Treatment Plant Decommission Project |
Physical Address | View project details and contacts |
City, State (County) | Charleston, WV (Kanawha County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sanitary Sewers, Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The approximate quantities of work to be bid upon are described as follows: 1 LS Pre-Construction Video of Project Area; 1 LS Erosion and Sediment Controls; 80 LF 12” PVC SDR-35 Gravity Sewer Line; 35 LF 8” PVC SDR-35 Gravity Sewer Line; 4,850 LF Dual 4” PVC C-900 Forcemain; 2 EA 48” Diameter Manhole Base, Cone Top, Regular Casting, with Watertight Frame and Cover; 2 VF 48” Diameter Manhole Riser Pipe; 125 LF 24” Steel Casing (Bore & Jack); 65 LF 16” Steel Casing (Bore & Jack); 3 EA Dual 3/4” Air Release Valve Assembly; 4 EA Dual 4” Pressure Inline Forcemain Cleanout; 2 EA Connection of Proposed Gravity Sewer Line to Existing Gravity Sewer; 275 LF Gravel Driveway/Road Repair; 4,575 LF Reclamation of Disturbed Area; 1 LS for Gerrardstown Pump Station; 1 LS Demolition of Existing Package WWTP; 1 EA Connection of New Forcemain to Existing Manhole. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, New Construction, Sewage Treatment Plant, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |