Similar Projects
Last Updated | 09/11/2019 01:27 PM |
Project Title | City of Holland Matt Urban Court Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Holland, MI (Ottawa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $44,304 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work shall consist of providing all labor, material and equipment necessary and resurfacing the basketball courts. 1. The surface shall be thoroughly cleaned and scraped to remove irregularities, dirt and debris. All peeling, loose, or delaminated paint shall be removed. 2. All cracks will be scarified to remove any prior crack repair material, any heaved material, and to ensure a more uniform space. 3. Entire court surface shall be power washed with a pressure washer to remove all dirt and stains, and to ensure proper adhesion of the acrylic color coatings. 4. Minor depressions, rough areas, or any other area deemed necessary for repair shall be filled and leveled with the appropriate material as per the manufactures specifications to help level the court surface as much as possible. Cracks shall be cleaned of dust, dirt and debris including vegetation and filled with an acrylic base crack filler designed for crack filling of asphalt or concrete courts according to the manufacturer’s recommendations. 5. Install Action Herculan TC Pro 7 + 2 tennis surfacing system comprised of a rubber base mat laid in adhesive and a two component polyurethane surface that is field applied in a seamless monolithic application. Total system profile height 9mm. on the basketball court. Court color: Blue basketball court area with green perimeter. White game lines. 6. Landscape for water to run off the court eliminating any areas that water may remain on the court. 7. Contractor will dispose of all trash, debris, paint and other materials in a proper and safe way. 8. All system component parts must be supplied by Action Floor Systems, LLC of Mercer WI. 9. The flooring contractor must be approved by Action Floor Systems, LLC of Mercer WI. 10. Flooring system shall be independently verified to meet or exceed the SCORES criteria for environmental design and athletic performance. Sustainable Construction Of Renewable Engineered Surfaces. | ||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |