Similar Projects
Parkview Gardens IV
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Caledonia, WI 53108

Parkview Gardens IV
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Caledonia, WI 53108

Case High School 2020 Bond - Racine Unified School District
Build-out, Infrastructure
Design
$31,268,754 CJ est. value
Racine, WI 53403

Knapp Elementary School - 2020 Bond - Racine Unified School District
Infrastructure, Renovation
Design
$201,000 CJ est. value
Racine, WI 53403

2022 Assessable Streets and Alleys
Infrastructure
Post-Bid
$2,000,000 est. value
Racine, WI

2022 Paving Program
Infrastructure
Post-Bid
Mount Pleasant, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Wisconsin Avenue (2nd to 16th Street) Two-Way Conversion
Infrastructure
Results
$110,000 to $120,000 est. value
Racine, WI 53403

Buildings 1 and 2 of the Waterford Lofts Project
New Construction, Infrastructure
Construction
$11,000,000 CJ est. value
Waterford, WI 53185

W. 6th Street, Bridge Over Root River, P-51-0709
Infrastructure
Construction
$6,734,483 CJ est. value
Racine, WI 53404

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

Highway 20 Water Main - West Boulevard to Marquette (Department Of Transportation) - City of Racine
Infrastructure
Conception
$1,000,000 CJ est. value
Racine, WI 53403

Park High School Remodel - 2020 Bond - Racine Unified School District
Build-out, Infrastructure
Design
$57,419,277 CJ est. value
Racine, WI 53403

Road Crack Repair
Infrastructure
Post-Bid
Burlington, WI

Last Updated 04/13/2023 10:12 AM
Project Title

Brighton Dale Sewer Main - Parks-13 - Kenosha County

Physical Address View project details and contacts
City, State (County) Kansasville, WI 53139   (Racine County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The sewer main needs to be replaced at Brighton Dale Park. The current sewer main is 49 years old and beyond its useful life. It is corroded due to septic sewage sitting in the pipes for long periods of time. As of October 04, 2021 no new CIP issued, this project is currently in the FY 2021-2025 CIP . Funding for this project is allotted in the city's capital improvement plan for Fiscal Year 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents