Similar Projects
Heating Distribution Upgrades - MEP
Bidding
$2,870,000 est. value
Madison, WI 53705

Heating Distribution Upgrades - General
Bidding
$2,870,000 est. value
Madison, WI 53705

Replace Boilers B415
Post-Bid
$10,000,000 to $20,000,000 est. value
Tomah, WI 54660

Boiler Replacement
Post-Bid
Milwaukee, WI 53207

Air Handling Unit Replacement
Results
$240,000 est. value
Barron, WI 54812

Steam Heat Exchanger Replacement
Results
Less than $185,000 est. value
Fox Lake, WI 53933

Arts Sculpture Laboratory - MEP
Bidding
$2,020,000 est. value
Whitewater, WI 53190

High Speed Rubberized Garage Doors
Term Contract
Post-Bid
Milwaukee, WI 53205

Boiler Replacement at Brewster Village
Results
Appleton, WI 54914

Utility Tunnel Steam and Condensate Repairs
Bidding
Waupun, WI 53963

Mechanical Ventilation Installation And Electrical Repair
Renovation
Post-Bid
Waukesha, WI 53146

Air Compressor Replacement
Results
Less than $50,000 est. value
Madison, WI 53703

Plasma Disinfection Modifications
Post-Bid
Waukesha, WI 53146

Domestic Water Heater Replacement
Results
Less than $190,000 est. value
Madison, WI 53703

Waukesha County Expo Arena Mechanical Upgrades
Post-Bid
Waukesha, WI 53188

Reported 03/04/2021 12:00 AM
Project Title

Replace Steam Line- FCI Oxford

Physical Address View project details and contacts
City, State (County) Oxford, WI 53952   (Adams County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the entire run of approximately 700 feet of existing fiberglass, steam condensate return line from the powerhouse to the UNICOR building. The contractor shall furnish and install approximately 700ft of 3" Carbon Steel sch-80 steamless pipe from a designated tie-in point in the powerhouse, to a designated tie-in point in the UNICOR building. The contractor shall be responsible for insulating the 3" condensate line with 2" thick "Foamglas" insulation with aluminum jacketing. The contractor shall ensure that the installation and insulation of the piping complies with all ASME standards. The contractor shall also ensure that the layout and installation is in conformance with the manufacturer. All excavation and backfilling shall be conducted by FCI Oxford.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Steam and Condensate Piping and Pumps, Heat Exchangers for HVAC, Steam-to-Steam Heat Exchangers.
Division 40 - Process Integration, Steam Process Piping, High-Pressure Steam Process Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents