Similar Projects
Reported | 05/07/2021 12:00 AM |
Project Title | VCT Flooring - Howard Elementary |
Physical Address | View project details and contacts |
City, State (County) | Gallatin, TN 37066 (Sumner County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | General Flooring Removal Requirements 1. Removal of existing flooring to be completed by Owner. C. General Installation Requirements 1. Surface Preparation: VCT a. Use leveling compound, where needed, that is compliant with the adhesive and VCT manufacturer’s recommendations. Smooth areas to uniformity. b. Thoroughly clean the area of all loose debris and other foreign matter. 2. Surface Preparation: Cove Base a. Area is to be dry and clean, free of dirt, dust, oil, wax or other foreign matter with will interfere with a good bond. 3. Installation: VCT a. Layout and plan the area to receive VCT flooring. b. Allow all flooring materials and adhesives to condition to the room temperature. c. Apply adhesive to the existing floor surface in accordance with the manufacturer’s instructions. d. Install VCT in accordance with the manufacturer’s installation guide. 4. Installation: Cove Base a. Cove base shall be installed after the flooring is complete in accordance with the manufacturer’s instructions. b. Plan seam locations so that no seams end on outside corners. c. Check each carton of base for dye-lot numbers to assure there is no mixing of dye-lots during installation. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |