Similar Projects
Chilton - Hilbert
Infrastructure
Conception
$100,000 CJ est. value
Chilton, WI 53014

Chilton - Hilbert
Infrastructure
Conception
$100,000 CJ est. value
Chilton, WI 53014

Marina Inlet Culvert Replacement - Wisconsin Department of Natural Resources
Infrastructure
Design
$318,000 CJ est. value
Sherwood, WI 54169

Marina Inlet Culvert Replacement - Wisconsin Department of Natural Resources
Infrastructure
Design
$318,000 CJ est. value
Sherwood, WI 54169

Wedging and Sealing
Infrastructure
Post-Bid
$240,000 est. value
Potter, WI

Hot Mix Asphalt on Various Roads
Infrastructure
Post-Bid
$300,000 est. value
New Holstein, WI

Pond View Estates Road
Infrastructure
Results
Sherwood, WI 54169

2022 Crack Seal Program
Infrastructure
Results
Hilbert, WI 54129

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

RFP Engineering- Chilton- Hilbert
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hilbert, WI 54129

RFP Engineering- Chilton- Hilbert
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hilbert, WI 54129

Wedging and Seal Coating
Infrastructure
Post-Bid
$200,000 est. value
WI

2022 Asphalt Street Resurfacing Program
Infrastructure
Results
Hilbert, WI 54129

Asphalt Bridge Approaches - Appleton, Sth 441
Infrastructure
Pending Verification
$7,000,000 CJ est. value
Hilbert, WI 54129

Last Updated 09/04/2023 11:32 PM
Project Title

2023/2024 Main Street Reconstruction

Physical Address View project details and contacts
City, State (County) Chilton, WI 53014   (Calumet County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Chilton, acting through its City Council, hereby gives notice that online Bids will be received in the offices of McMahon Associates, Inc. The work shall consist of total reconstruction of approximately 5,000 feet of roadways (Main Street, Center Street, Mill Street) including an asphalt and concrete pavement alternative. A prior Contract for utility reconstruction will commence in September, work in this Contract may begin fall 2023 or spring 2024 at the CONTRACTORS option. Major quantities include 20,000 S.Y. of roadway excavation, stone base, and asphalt or concrete pavement; 10,000 L.F. of curb & gutter, 20,000 S.F. of concrete sidewalk and apron. The approximate value of the construction contract is $2 M. All Bidders shall Bid in accordance with and upon the Bid Forms included in the Contract Documents. The Project Documents are on file for inspection at the offices of McMahon Associates, Inc., 1445 McMahon Drive, Neenah, Wisconsin 54956. In order to be a Plan Holder or Bidder, each firm or organization shall either obtain Bidding Documents from the McMahon Associates, Inc. or by obtaining a hard copy as designated in this Advertisement For Bids. Digital Bidding Documents may be obtained for a non-refundable $40.00 On-line bid submission is available for this project for a non-refundable $55.00. Neither the Owner nor McMahon Associates, Inc. shall be held responsible for the scale of downloaded Drawings. Printed Drawings obtained from Blue Print Service Company shall be considered to be scalable. Blue Print Service Company 2350 West Bershing Street, Suite A Appleton, WI 54914 920-733-4539 - Telephone 920-733-1438 - Fax bps@blueprintservice.com - Email Blue Print Service Company 2201 South Oneida Street, Suite 8 Green Bay, WI 54304 920-494-4539 - Telephone 920-494-4551 - Fax bps@blueprintservice.com - Email No Bid shall be received unless accompanied by a Certified Check or satisfactory Bid Bond payable to the City of Chilton in an amount not less than 5% of the maximum Bid as a guarantee that, if the Bid is accepted, the Bidder will execute and file the Contract, Performance/Payment Bonds and Insurance Certification, as required by the Contract Documents, within 15-days after the Notice of Award. The owner reserves the right to reject any and all Bids, waive any informalities in Bidding or to accept the Bid or Bids which best serves the interests of the City of Chilton. No Bid shall be withdrawn for a period of 30-days after the scheduled opening without the consent of the owner. The Contract letting shall be subject to the provisions of Sections 66.0901, 66.0903 and 779.14 of the Wisconsin Statutes. Published by the authority of the City of Chilton acting through its City Council. Bid Result. SCHEDULE A: MCC, INC $1,607,241.00 SCHEDULE B:VINTON CONSTRUCTION $2,176,187.50

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents