Similar Projects
Kisker And Route 364 Self Storage
New Construction, Infrastructure - 124,032 SF
Conception
$14,000,000 CJ est. value
Saint Peters, MO 63376

Lowe's Tool Rental Expansion
Addition, Demolition, Infrastructure - 3,196 SF
Design
$1,200,000 CJ est. value
Saint Charles, MO 63301

Tidal Wave Car Wash / St Peters
New Construction, Infrastructure - 5,400 SF
Design
$1,400,000 CJ est. value
Saint Peters, MO 63376

St. Charles County Regional Airport - Construct Taxilanes
Infrastructure
Bidding
$75,000 CJ est. value
Portage des Sioux, MO 63373

St. Charles County Regional Airport - Construct Taxilanes
Infrastructure
Bidding
$75,000 CJ est. value
Portage des Sioux, MO 63373

Muegge Road
New Construction, Infrastructure
Post-Bid
Saint Charles, MO 63302

HDPE Pipe and Fittings for West Pearce Waterline
Infrastructure
Post-Bid
Wentzville, MO 63385

2021 District Concrete
Results
Dardenne Prairie, Lake Saint Louis, O'Fallon, Wentzville, MO 63385

Hanley Road Reconstruction and Improvements
Infrastructure
Results
Dardenne Prairie, MO

Technology Drive / Multi-Residential
New Construction, Infrastructure
Construction
$54,000,000 CJ est. value
Lake Saint Louis, MO 63367

Reserve at St. Peters
New Construction, Infrastructure
Pending Verification
$53,000,000 CJ est. value
Saint Peters, MO 63376

The Chabad Jewish Center / St Charles County
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cottleville, MO 63366

Little Sunshine's Playhouse & Preschool
New Construction, Infrastructure - 11,354 SF
Design
$2,000,000 CJ est. value
Lake Saint Louis, MO 63367

Bridge Rehabilitations and Microsurfacing
Infrastructure
Bidding
$25,000,000 CJ est. value
Wentzville, MO 63385

Chicken N Pickle - Package 2
New Construction, Infrastructure - 24,162 SF
Post-Bid
$5,000,000 CJ est. value
Saint Charles, MO 63303

Last Updated 01/05/2023 03:26 PM
Project Title

Wolfrum Road Trail Extension

Physical Address View project details and contacts
City, State (County) Weldon Spring, MO 63304   (Saint Charles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $174,171 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 5,2023, project was awarded to E Meier Contracting , awarded amount is $174,170.75.** The Scope of Work included installation of an asphalt trail varying in width from 5 ft. to 10 ft. along Wolfrum Road from Willow Lake Court to Grey Oaks. The scope shall include the trail, ADA ramps, grading, removal of existing items, storm sewer, and other incidential items and work described in the Project Manual or reasonably inferable therefrom to construct the referenced project. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. The City of Weldon Spring anticipates issuing notice of award and notice to proceed in Fall of 2022 and anticipates a project start date, weather permitting, in Spring of 2023. Please note that Missouri's Prevailing Wage Law establishes a minimum wage rate for public works projects in Missouri valued over $75,000. If the project is over $75,000, the wage rates applicable to this project have been predetermined as required by law and are set forth in this specification. Effective January 1, 2009, and pursuant to RSMo 285.530 (1), No business entity or employer shall knowingly employ, hire for employment, or continue to employ an unauthorized alien to perform work within the state of Missouri. The successful bidder must submit a sworn affidavit and documentation affirming the business entity's enrollment and participation in the federal work authorization program and that all of its employees working for the contracted services are not illegal immigrants. Upon signing the contract, the successful contractor and any subcontractor performing the work shall provide a ten-hour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees. The City of Weldon Spring hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents