Similar Projects
Mechanical Contractors and Related Trades
Bidding
FL

J--Return Fan, Replace
Post-Bid
Miami, FL 33125

HUD - AC Replacement in LAN Room on 6th Floor
Post-Bid
Miami, FL 33131

FDOT HVAC Install: Sneads WB Weigh Station
Results

Replace Package AC Unit
Results
Homestead, FL 33030

Chiller Plant Services
Term Contract
Post-Bid
Miami, FL 33199

Replacement of AHU-16
Results
Miami, FL 33136

Testing & Certifications of Fume Hoods
Post-Bid
Miami, FL 33125

Heat Pump AHU Replacement (SBE Set Aside)
Results
Miami, FL 33136

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

Replace Chillers and Air Handlers, Multi-Facilities
Results
$500,000 to $1,000,000 est. value
Homestead, FL 33039

HVAC Chillers/Equipment and Water Treatment Services
Post-Bid
FL

ACC-West Duct Heater Replacement (SBE Set Aside)
Results
$100,000 est. value
Miami, FL 33136

HVAC and Mechanical Products
Term Contract
Post-Bid

J041--Chiller 1 and 3 VSD Replacement
Results
Miami, FL 33125

Reported 10/20/2020 10:01 AM
Project Title

Retrofit Mailroom #215 - Exhaust Fan and Filtration System

Physical Address View project details and contacts
City, State (County) Miami, FL 33132   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $35,000 to $40,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

James L. King Federal Justice Center: USAO Second Floor Mailroom Exhaust - Provide Design/Build Services to install a new mailroom exhaust fan and filtration system for the U.S. Attorney's Office Mailroom Room 215, for their second floor mailroom, including exhaust fan, ductwork, filtration system, exhaust hood, electrical power and switching for a complete and operational system. Architectural New Work Requirement: - Repair any damaged existing finishes to like new condition. - Any new chases to conceal ductwork in occupied areas shall be constructed to the same level of finish of the existing space. - DB Contractor shall be responsible for any cutting of exterior facade in order for the ductwork to exit the building. Any new wall louvers, etc. shall match existing louvers and shall be the responsibility of the DB Contractor. Mechanical New Work Requirements New Exhaust Hood: - Install new exhaust canopy hood or containment laboratory style hood. New Exhaust Fan and Ductwork: - Install 2400 cfm exhaust fan ducted from hood directly to the outside. - Exhaust fan shall be installed above the existing ceiling in a location that will not disturb the occupants of the building when running. - Exhaust fan shall be inline centrifugal type designed for low noise. - Ductwork shall run above ceiling or in concealed chase from the second floor mailroom to the exterior of the first floor. DB Contractor shall be responsible for determining the best routing and termination of the exhaust ductwork. New Make-up Air Supply Fan and Ductwork: - Install 2000 cfm supply fan / hood make-up air ducted from hood directly to the outside. - Supply fan shall be installed above the existing ceiling in a location that will not disturb the occupants of the building when running. - Supply fan shall be inline centrifugal type designed for low noise. - Ductwork shall run above ceiling or in concealed chase from the second floor mailroom to the exterior of the first floor. DB Contractor shall be responsible for determining the best routing and termination of the supply ductwork. - Supply air intake and exhaust air intake shall be installed as not to short circuit or recirculate back into the supply air. Filtration and UV Light System: - Install RS-3 Integrated Air Purification System by Dynamic Air Quality Solutions, or equal, in ductwork between the hood and exhaust fan. The RS-3 is an electrically enhanced filtration and UV light system. The filters capture the particulate and the UV light kills the contaminant. - RS-3 Filtration and UV light unit shall be installed and accessible within the mailroom. - Filtration unit shall have a MERV rating of 13 minimum. Electrical New Work Requirements Power Requirements: - Provide one dedicated 115 volt, 1 phase power from existing electrical panel to new exhaust fan, switch and Air Purification Unit. - Install 115 v /1 phase exhaust fan on dedicated wall switch with a delay-off timer, say 15 to 30 minutes. - Install UV Light and filtration unit in ductwork with continuous 115 v /1 ph power from hot side of fan switch power, with local disconnect, or switch at RS-3, to be able to turn power off to RS-3 unit in order to change UV lamps, ballast, or change filters. - Provide one dedicated 115 volt, 1 phase power from existing electrical panel to new supply fan. - Interlock supply fan with exhaust fan via relay or similar so that supply fan runs only when the supply fan runs. - Provide local electrical disconnect for supply fan.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents