Similar Projects
Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

2022 Park Improvements Sterling Meadows, Hill Farm, Grand Oaks, and Administrative Center
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Crystal Lake, IL 60014

Roofing, and Gutter Replacement for a Single Family Home on East Diggins Street
Renovation
Sub-Bidding
$50,000 CJ est. value
Harvard, IL 60033

Johnsburg Junior High School Roof-21
Post-Bid
Less than $100,000 est. value
Johnsburg, IL 60051

Roofing, and Gutter Replacement for a Single Family Home
Post-Bid
Algonquin, IL 60102

2021 Partial Roof Replacement
Results
Woodstock, IL 60098

Re-Roofing of the Brookdale Office Complex Buildings
Results
Woodstock, IL 60098

Building D Roof Rehabilitation
Post-Bid
Crystal Lake, IL 60012

REC Center Roofing Project
Results
Huntley, IL 60142

Replace/Repair Roofing Systems at Multiple Sites
Alteration
Post-Bid
Less than $250,000 est. value

Sheet Metal Roof Over Rotunda of the Library
Alteration
Results
Crystal Lake, IL

2022 Roofing Work at Mchenry East High School
Alteration
Post-Bid
McHenry, IL 60050

Roof System Replacements And Restoration
Alteration
Results
$682,000 est. value
Huntley, IL 60142

500 Russel Court Roof Replacement
Alteration
Post-Bid
Woodstock, IL 60098

Roofing Work
Renovation, Alteration
Results
Algonquin, Carpentersville, IL 60102

Last Updated 08/15/2022 03:33 PM
Project Title

Main Beach Flat Roofs Replacement

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL 60014   (McHenry County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Misc. Recreational, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $407,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed proposals for Main Beach flat roofs replacement, McHenry County, Illinois, will be received. The contract will be awarded at a Board Meeting of the Park Board of Commissioners on September 8th, 2022, at 6:30 p.m. 2. DESCRIPTION OF THE WORK - The scope of work involves furnishing all of the required labor, materials, equipment, implements, parts and supplies necessary for, or appurtenant to, replacement of flat roofs with Black EPDM, in accordance with the specifications dated July 28th, 2022, and any authorized change orders which have been signed by both parties. 3. Each bid shall also include three (3) references of clients for which similar work was performed, listing the name, address and telephone number of the client, a description of the work, and the construction cost. 4. ILLINOIS PREVAILING WAGE ACT - All contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). 5. REJECTION OF BIDS - The Crystal Lake Park District reserves the right to reject any and all bids and to waive technicalities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents