Similar Projects
Seminary Road Redevelopment
New Construction
Conception
Alexandria, VA 22304

North Columbus Street Multifamily Development
New Construction - 75,188 SF
Conception
Alexandria, VA 22314

King and South Henry Street Mixed-Use Development
New Construction, Infrastructure - 15,000 SF
Design
$10,000,000 CJ est. value
Alexandria, VA 22314

King and South Henry Street Mixed-Use Development
New Construction, Infrastructure - 15,000 SF
Design
$10,000,000 CJ est. value
Alexandria, VA 22314

Blue Heron Landing Park
Infrastructure
Bidding
$775,000 CJ est. value
Chesapeake, VA 23464

Blue Heron Landing Park
Infrastructure
Bidding
$775,000 CJ est. value
Chesapeake, VA 23464

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

2022 Latex Modified
Infrastructure
Results
$2,130,000 est. value

The Waypoint at Fairlington
New Construction, Renovation - 137,212 SF
Construction
$25,218,867 est. value
Alexandria, VA 22302

Royal Street Condominiums
New Construction, Demolition - 209,930 SF
Construction
Alexandria, VA 22314

Carlyle Block P - South Tower
New Construction - 246,223 SF
Pending Verification
Alexandria, VA 22314

Aspire Alexandria
New Construction - 132,446 SF
Pending Verification
Less than $50,000,000 est. value
Alexandria, VA 22314

Del Ray Mixed Use
New Construction - 88,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Alexandria, VA 22301

Last Updated 02/01/2023 05:05 PM
Project Title

Pickett Street & Burnside Place Multi-Residential - Phase II / Alexandria

Physical Address View project details and contacts
City, State (County) Alexandria, VA 22304   (Alexandria City County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $75,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a mixed-use development on the former BoatUS site (880 & 890 South Pickett Street and 620 Burnside Place). The project will be completed in two phases. The first phase included a self-storage facility which has been completed.The scope was initially pitched in 2018 with the first phase, however a separate Development Special Use Permit will be required for the second phase and as of August 23, 2022 has not been filed. The second phase will include a multi-family building in the future at the site of the interim parking lot. As of February 1, 2023, no building permits have been filed with the City of Alexandria. The Rezoning was approved. . The architect and general contractor information have not been disclosed. A firm schedule has not been established.*

Details

5 Stories Above Grade, 473,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents