Similar Projects
Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

USH 45, City of Fond Du Lac Ex-jt Payment 7 of 11 FY23
Infrastructure
Design
$750,000 to $1,000,000 est. value
Fond du Lac, WI

Summit Automotive Vehicle Service and Repair
New Construction, Infrastructure - 11,485 SF
Design
$2,500,000 CJ est. value
Fond du Lac, WI 54937

Roosevelt Park Restrooms Construction
Demolition, New Construction, Infrastructure
Bidding
$550,000 CJ est. value
Fond du Lac, WI 54935

Rosendale - Oshkosh; STH 23 - CTH Ff, STH 026
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Brandon, WI 53919

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Transit Development Plan 2022
Term Contract
Post-Bid
Fond du Lac, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Single Chip Seal Coat
Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Froedtert Health and ThedaCare
New Construction, Infrastructure - 18,000 SF
Pending Verification
$35,000,000 CJ est. value
Fond du Lac, WI 54935

Pardeeville - Manchester Const/ Structure Replacement
Infrastructure
Conception
$1,000,000 CJ est. value
Ripon, WI 54971

Aurora Medical Center Fond du Lac
Addition, New Construction, Infrastructure - 70,000 SF
Design
$67,000,000 CJ est. value
Fond du Lac, WI 54937

Last Updated 01/23/2023 04:10 PM
Project Title

Replace Pavement from I-43 to 8th Street, downtown City of Manitowoc - Calumet/Washington, C Manitowoc

Physical Address View project details and contacts
City, State (County) Metomen, WI 54971   (Fond du Lac County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 23, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Solicitation ID: NE-01 The pavement needs treatment to extend its service life. Rehabilitation project of 3.23 miles to replace pavement from I-43 to 8th Street, downtown City of Manitowoc in Manitowoc County. Also includes curb ramp upgrades, and storm sewer repair/replacement. The City will be replacing underground water and sanitary services; and additional items may be added to accommodate City needs. The project contracts will be staged; the first stage includes: investigations, documents, reports, preliminary design alternatives, and preliminary plans to Final Scope Certification Approval. Anticipated Construction Cost: $11,000,000-$11,999,999 Advertised Fixed Fee %: 7.25 DBE goal on project: No The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultants actual indirect rate. Interviews will not be conducted. The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Calumet/Washington, C Manitowoc *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents