Similar Projects
Last Updated | 03/15/2022 05:22 PM |
Project Title | Lenape Regional High School District - Seneca High School Synthetic Turf Phase I Site Preparation |
Physical Address | View project details and contacts |
City, State (County) | Tabernacle, NJ 08088 (Burlington County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Landscaping/Irrigation, Site Development |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. The Work as defined by the General and Supplementary Conditions, the extent of which is covered in the Contract Documents and is described herewith (briefly) and without force of effect upon the Contract Documents. B. BASE BID SCOPE OF WORK – PHASE I TURF FIELD SITE PREPARATION. The scope of this project includes the site preparation work necessary to accommodate the installation of a new synthetic turf field. The Contractor is advised that the contract for the supply and installation of the proposed turf field (PHASE II TURF FIELD CONTRACT) has been awarded to Shaw Sports Turf, 185 South Industrial Blvd., Calhoun, GA 30701. The scope of the PHASE I TURF FIELD SITE PREPARATION CONTRACT shall include, but is not limited to, the following: 1. CONTRACT NO. 1 – CONTRACT FOR PHASE I SITE PREPARATION FOR NEW SYNTHETIC TURF FIELD a. General Coordination responsibilities including the following: 1) Coordination of the work with the Owner, and the PHASE II TURF FIELD CONTRACTOR. 2) The Contractor shall be responsible for the complete preparation of the existing site, including but not limited to: a) Excavation of the existing fields, and stock-piling / removal of excess fill, topsoil and debris. b) Removal, capping and termination of utilities noted and impacted by the scope of the work including irrigations systems c) Grading and compaction of the existing sub-base, including sub-grade work, soil stabilization and rock excavation as required. d) Supply and installation of the aggregate turf field base. Scope of the work is to include testing for compaction and permeability of aggregate base. e) Supply and installation of the new subsurface drainage facilities, inlets and manholes. f) All indicated and required sediment/erosion control measures. g) Preservation and reconstruction of existing site improvements noted. h) Construction of new concrete curbs and nailers as detailed within the contract drawings. i) Supply and installation of new goal posts. 3) Cleaning and site restoration as required to restore existing conditions to their pre-contract state. 2. RESPONSIBILITIES OF THE PHASE II TURF FIELD CONTRACTOR: a. Supply and installation of the new synthetic turf field, including turf, fill, field markings, logos and post-construction G-Max Testing. b. Coordination of the work with the Owner, and the PHASE I SITE PREPARATION CONTRACTOR (The work of this contract). |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |