Similar Projects
Greenhouse/Headhouse Heating and Ventilation Modifications and Repairs
Infrastructure
Design
$100,000 to $250,000 est. value
Raleigh, NC 27606

Olive Chapel Elementary School HVAC Upgrades
Alteration
Bidding
Apex, NC 27502

HVAC Water Treatment Installation and Repair Service
Term Contract
Bidding
NC

Police Headquarters HVAC Replacement
Post-Bid
Raleigh, NC

HVAC Upgrades to Thomas Hall
Post-Bid
Less than $500,000 est. value
Raleigh, NC 27607

DPS - Morrison Aggrey Dorm Heating System Replacement
Results
Raleigh, NC 27699

Cameron Village Library DDC Controls Replacement
Results
Raleigh, NC 27600

HVAC Installation and Repair Service
Term Contract
Bidding
NC

Police Department Headquarters HVAC Replacement
Post-Bid
Raleigh, NC 27615

Chiller Replacement - Lee Hall
Term Contract
Results
Less than $600,000 est. value
Raleigh, NC 27600

HVAC Equipment Cleaning Service
Term Contract
Bidding
NC

Air Cooled Chillers Building Automation Lab
Post-Bid
Raleigh, NC

Rooftop Air Handlers Replacement
Results
$362,139 est. value
Raleigh, NC 27604

HVAC Systems Water Treatment Preventative Maintenance Service
Term Contract
Bidding
NC

Chiller Installation and Repair
Term Contract
Post-Bid
Raleigh, NC

Reported 04/07/2022 12:00 AM
Project Title

Convention Center Re-Build Cooling Towers

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27601   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall supply all tools, material, hardware, and technical support necessary to perform and direct the work as necessary to complete this project. Ideally, repairs will be conducted without shutting down the facilities HVAC. Therefore, Bids will include an overview narrative explaining how the repairs will be conducted including planned or predicted HVAC interruptions. All Towers 1. Complete fill kit change-out. 2. Removing the existing PVC hanging sheet fill material and the existing supports. Provide and install new OEM BAC BACross fill material complete with new 304 Stainless Steel supports. 3. Upgrade all galvanized side panels to 304-SST to match the hot & cold-water basin materials. Contractor shall supply all tools, material, hardware, and technical support necessary to perform and direct the work as necessary to complete this project. Ideally, repairs will be conducted without shutting down the facilities HVAC. Therefore, Bids will include an overview narrative explaining how the repairs will be conducted including planned or predicted HVAC interruptions. All Towers 1. Complete fill kit change-out. 2. Removing the existing PVC hanging sheet fill material and the existing supports. Provide and install new OEM BAC BACross fill material complete with new 304 Stainless Steel supports. 3. Upgrade all galvanized side panels to 304-SST to match the hot & cold-water basin materials.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents