Similar Projects
Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Cambrian Park Plaza Shopping Center
New Construction, Demolition - 184,060 SF
Conception
$10,000,000 CJ est. value
San Jose, CA 95124

Icon/Echo Towers
New Construction, Demolition - 478,500 SF
Design
$600,000,000 est. value
San Jose, CA 95113

El Paseo de Saratoga Center
New Construction, Demolition, Infrastructure - 159,000 SF
Design
$416,720,000 est. value
San Jose, CA 95129

Havana-Midfield Pocket Park
New Construction
Bidding
$500,000 est. value
San Jose, CA

Park: All Inclusive Playground - Emma Prusch
New Construction
Post-Bid
$2,250,001 to $2,750,000 est. value
San Jose, CA

Park Tennis Court Reconstruction Braly and Columbia Fairwood
Renovation
Post-Bid
Sunnyvale, CA

Creekside and Meadowbrook Group Area Renovation at Vasona Lake County Park
Renovation
Results
$924,206 est. value
Los Gatos, CA 95032

All Inclusive Rotary Playgarden
New Construction
Results
$1,300,000 est. value
San Jose, CA 95154

Mixed-Use Residential Village
New Construction
Pending Verification
San Jose, CA 95131

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Montague Park Rehabilitation
Renovation
Post-Bid
Santa Clara, CA 95054

FEMA JFG Koi Pond and Pump
New Construction, Infrastructure
Results
$1,751,702 est. value
San Jose, CA 95112

Butcher Park Playlot Renovation - City Of San Jose
Renovation, Infrastructure, Alteration
Conception
$596,000 est. value
San Jose, CA 95124

Prequalification for JOC Contractors
Renovation
Post-Bid
San Jose, CA

Last Updated 06/29/2022 07:33 AM
Project Title

Fayette Park Improvements

Physical Address View project details and contacts
City, State (County) Mountain View, CA 94040   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,475,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the grading, drainage, utility tie-ins, pavement, concrete work, signage, fencing, site furnishings, play structures, plantings, irrigation, and other miscellaneous work for the construction of a City park.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents