Similar Projects
Pressly Station
New Construction - 357,500 SF
Conception
$10,000,000 CJ est. value
Aiken, SC

Toolebeck Commons
New Construction
Conception
Aiken, SC

Lamplighter Villages
New Construction
Design
Aiken, SC

University Lane Townhomes
New Construction
Design
Aiken, SC

Town Creek
New Construction
Construction
Aiken, SC 29801

The Retreat at Walnut Village
New Construction
Construction
North Augusta, SC

Clearwater Preserve
New Construction
Pending Verification
Graniteville, SC

Byrd Village
New Construction
Pending Verification
Graniteville, SC 29829

Townhomes of Chukker Creek Phase 2
New Construction
Conception
Aiken, SC 29803

Rivers Crossing Subdivision
New Construction
Design
SC 29801

Townhomes of Chukker Creek
New Construction
Construction
Aiken, SC

Summerton Village Section 3
New Construction
Pending Verification
Aiken, SC 29803

Deerfoot Pines Subdivision
New Construction
Conception
Graniteville, SC 29829

Ortiz House
New Construction - 2,000 SF
Construction
$500,000 to $1,000,000 CJ est. value
Salley, SC

The Sanctuary Subdivision
New Construction
Conception
Aiken, SC

Reported 06/04/2020 09:09 AM
Project Title

Kemper Downs - Section 2

Physical Address View project details and contacts
City, State (County) Aiken, SC   (Aiken County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes, Single-Family Homes
Contracting Method Builder to Subcontract.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Total sq ft for project not available at this time.

Details

42 Multi-Family Homes, New Construction, 32 Single-Family Homes, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents