Similar Projects
US 730/4.4 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$2,479,000 CJ est. value
McNary, OR 97882

Eastern Oregon variable message signs
Alteration
Design
$1,069,175 est. value
Pendleton, OR 97801

RTC Date Street Utilities Extension Rees Training Center Umatilla
Infrastructure
Bidding
$760,000 CJ est. value
Hermiston, OR 97838

Camp Umatilla Training Center (CUTC) Automated Record Fire (ARF) Range Upgrades
Renovation
Bidding
$19,000,000 CJ est. value
Hermiston, OR 97838

Regional Armory Emergency Enhancement Project
Renovation
Post-Bid
Pendleton, OR 97801

South Hill Commons - New Multi-family Affordable Housing Project
New Construction, Infrastructure - 172,202 SF
Post-Bid
$47,000,000 CJ est. value
Pendleton, OR 97801

The Camp Umatilla Training Center Front Entry Gate Phase I
New Construction
Results
$900,000 to $1,200,000 est. value
Hermiston, OR 97838

Nixyaawii One
Infrastructure
Results
$4,000,000 est. value
Pendleton, OR

Horizon Project
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hermiston, OR 97838

I-84: Stanfield-Pendleton pavement preservation
Alteration
Design
$12,641,999 est. value
Pendleton, OR 97801

ESB - Crescent Stamped Concrete Surfacing Phase III
Infrastructure
Bidding
$500,000 CJ est. value
Pendleton, OR 97801

Milton-Freewater Police and Dispatch Center
New Construction, Infrastructure - 7,780 SF
Post-Bid
$5,800,000 CJ est. value
Milton Freewater, OR 97862

2022 City Streets Overlay and Reconstruction Project
Infrastructure
Results
Pendleton, OR

US 730/4.4 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$448,000 CJ est. value
Umatilla, OR 97882

ESB Highway 11 MP 0.3 to 5 Crack Seal Project
Infrastructure
Results
$100,000 est. value
Athena, OR 97813

Last Updated 08/31/2022 12:36 PM
Project Title

Camp Umatilla Entry Gate Improvements - Phase 2 and 3

Physical Address View project details and contacts
City, State (County) Hermiston, OR 97838   (Umatilla County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to build a new entry point at Oregon Army National Guard (ORANG), Camp Umatilla Oregon (CUO) perimeter security system to improve operational readiness and ATFP (Antiterrorism Force Protection). This project (Phase 2) will construct a new guard house, covered port of entry, vehicle inspection area, and vehicle turnaround area. The single Point of Contact for all questions regarding the ITB, forms, Specifications, Plans, bidding process, changes, clarifications, requests for brand approval, substitution requests, the award process, protests and any other issues that may arise is: Name: Sam Goff - CPPB Phone: 971-355-3195 E-mail: samuel.a.goff.nfg@army.mil The following range is a project estimate for bonding purposes only: $1.0 to $1.2 Million Dollars *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents