Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

Westside Water Reclamation In-Plant Pump Station and Headworks - Design-Build
Design
$18,000,000 to $20,000,000 est. value
Daytona Beach, FL

New Water Booster Pump Station
New Construction
Bidding
$15,000,000 est. value
Nokomis, FL 34275

Lift Station Renovations No.7, for the Department of Environmental and Engineering Services (DEES)
Renovation
Bidding
$769,500 est. value
Margate, FL

AI Influent Pump Station Improvements
New Construction
Post-Bid
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Paradise Village Lift Station
New Construction
Post-Bid
Jacksonville, FL 32220

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Gumbo Limbo Nature Center Seawater Intake Replacement and Pump Station
Results
$3,100,000 est. value
Boca Raton, FL 33432

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Rehab of LS 54 and LS 65
Renovation
Construction
Clearwater, FL 33759

DBEH 20-1563 Repair Lift Station Various
Term Contract
Design
Canaveral As, FL

Lift Station Rehabilitation Florida Mango, Waterside and Woodhaven
Renovation
Bidding
$900,000 est. value
Palm Springs, FL

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Wastewater Lift Station 25
New Construction
Results
Less than $412,000 est. value
Deerfield Beach, FL 33441

Bridgeford Oaks Lift Station Rehabilitation
Construction
$225,000 est. value
Tampa, FL 33637

Last Updated 06/09/2022 11:51 PM
Project Title

Asset Maintenance - Rest Area

Physical Address View project details and contacts
City, State (County) Gainesville, FL   (Alachua County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $99,376,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Performance based Asset Maintenance Contract for the 20th St. Pump Station and all Rest Areas, Welcome Centers, and Weigh Stations in District Two (not including the (2) two Rest Areas located on I-75 in Alachua County). All janitorial services, lawn care, and landscaping at the Rest Areas, Welcome Centers, and Weigh Stations must be performed via subcontract with RESPECT of Florida or its successors. The Contractor shall be responsible for the oversight of the work performed by RESPECT of Florida and work together to ensure compliance with contract requirements. The Contractor will be required to begin work on August 11, 2022.

Details

Lift and Pump Stations, Renovation.
Division 01 - General Requirements, Cleaning and Waste Management.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents