Similar Projects
Molholm Elementary - 2018 Bond - Jefferson County Public Schools
Addition, Renovation, Infrastructure
Conception
$6,409,000 CJ est. value
Lakewood, CO 80214

FlatIron Crossing Redevelopment
Demolition, New Construction, Infrastructure - 60,000 SF
Conception
$150,000,000 CJ est. value
Broomfield, CO 80021

Murphy Express #8904 / Arvada
New Construction, Infrastructure - 2,800 SF
Design
$1,500,000 CJ est. value
Arvada, CO 80002

Colorado Research Exchange (CoRE)
New Construction, Infrastructure - 450,000 SF
Design
$60,000,000 CJ est. value
Broomfield, CO 80021

Camp George West Phase 1 Improvements
Infrastructure
Bidding
$1,250,000 CJ est. value
Golden, CO 80401

Serene Conservancy Project
Infrastructure
Bidding
$300,000 CJ est. value
Arvada, CO 80007

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Whisper Village
New Construction, Alteration
Post-Bid
Arvada, CO

Sky Ranch Cab Filing 4 Wet Utilities Project
Results
Lakewood, CO 80227

Gfl Museum 110 Exhibit Design & Construction
Renovation
Results
$280,000 est. value
CO

Murphy Express #8855 / Littleton - Rebid
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Littleton, CO 80127

Ih-21005 Lottery Remodel - 1881 Pierce St
Renovation
Construction
$70,000 est. value
Lakewood, CO 80214

The Lock at Flatiron
New Construction, Infrastructure - 1,425 SF
Pending Verification
$20,000,000 CJ est. value
Broomfield, CO 80021

Miners Alley Playhouse Former Meyer Hardware Building Renovation
Addition, Demolition, Build-out, Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Golden, CO 80401

Texas Roadhouse / Arvada
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Arvada, CO 80002

Last Updated 10/11/2022 01:38 PM
Project Title

Staunton SP - Archery Range Shade Shelters

Physical Address View project details and contacts
City, State (County) Pine, CO 80470   (Jefferson County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $222,230 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Colorado Division of Parks and Wildlife is accepting bids for the complete furnishing and installation of shade shelter structures over a concrete slab according to the plans and specifications. Contractor Questions: All questions related to the project shall be submitted via e-mail to the Project Manager, Dave Coffman at david.coffman@state.co.us. The deadline for questions is August 11, 2022 at 5:00 PM. Questions submitted after the deadline will not be addressed. All questions and answers will be posted as solicitation amendments on the Vendor Self Service (VSS) website. Bidders may not automatically be notified of the existence of a modification or addendum. It is the responsibility of the bidder to check the VSS website periodically to see if any modifications have been issued. Failure to retrieve such modifications and include their provisions in your bid response may result in your bid being deemed non-responsive. PERFORMANCE BOND, LABOR AND MATERIAL BOND: The successful bidder shall furnish a bond in the amount of 100% of the contract price for performance and for material and labor payment when bid is equal to or exceeds $150,000. The bond shall be executed on the standard State of Colorado form. The State requests that the Surety and Contractor leave the date of the Contract found on the first page of each bond form, blank and we will 'pen' in the date after the Controller executes the Contract. These bonds will be submitted along with the standard State Agreement form within 10 days of the "Notice of Award." NOTICE OF AWARD September 20, 2022 (Tentative) NOTICE TO PROCEED September 27, 2022 (Tentative) SUBSTANTIAL COMPLETION January 2, 2023 (Tentative)

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents