Similar Projects
Preventative Maintenance Inspections of Various HVAC Systems
Bidding
Less than $35,000 est. value
Braintree, MA

Renovation and Expansion of Existing Locker Rooms at Ulin Rink - Sub-Bids
Sub-Bidding
Less than $475,000 est. value
Milton, MA

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Annual Burner Services
Term Contract
Post-Bid
Dedham, MA

HVAC Maintenance, Inspections and Repairs for the Bellingham Public Schools
Results
$170,000 est. value
Bellingham, MA 02019

Replacement of Two Air Existing Air Cooled Chillers at North Quincy High School
Results
$882,000 est. value
Quincy, MA 02169

Senior Center HVAC Reheat Project
Post-Bid
$100,000 est. value
Canton, MA 02021

Bathroom Ventilation Upgrade, Julius Rubin Court 667-2
Results
Less than $125,000 est. value
Canton, MA

Wellesley Middle School Dust Collection
Post-Bid
Less than $30,000 est. value
Wellesley, MA 02481

Adams Shore Library HVAC UPgrade - Filed Sub Bids
Results
$490,000 est. value
Quincy, MA

Ductless Cooling Units
Post-Bid
$148,000 est. value
Westwood, MA

Chiller Replacement at Norwood Memorial Library
Results
$230,000 est. value
Norwood, MA

HVAC/R Services
Term Contract
Post-Bid
Less than $2,000,000 est. value

Energy Management Services
Results
Franklin, MA 02038

HVAC Upgrades at Braintree Town Hall
Post-Bid
Less than $120,000 est. value
Braintree, MA

Last Updated 12/18/2018 09:52 AM
Project Title

Adams Shore Library HVAC Upgrade - General Bids

Physical Address View project details and contacts
City, State (County) Quincy, MA   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $490,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required. Adams Shore Library HVAC systems upgrade with new mechanical systems. The existing boilers, chiller and Air Handling unit, ductwork and piping will be demolished and disposed of. The New HVAC systems will include a new Air Handling Unit, terminal devices, hot water boilers, piping and duct work. A new DDC system will be provided for the entire building. The existing electrical system will be modified to accommodate a new sub panel, new breakers and new lighting for the mechanical room.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents