Similar Projects
China Poot Bay Lodge and Restaurant / Homer
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Homer, AK 99603

Terminal Road And Parking Lot Improvements - City of Kenai
Infrastructure
Conception
$1,750,000 CJ est. value
Kenai, AK 99611

Kwechak Creek Maintenance
Infrastructure
Bidding
$200,000 CJ est. value
Seward, AK 99664

Gravel CIP - Sport Lake Road / Hakala Drive / Cotman Court
Infrastructure
Bidding
$150,000 CJ est. value
Soldotna, AK 99669

Central Emergency Services Arc Loop Training Pad Expansion
Infrastructure
Post-Bid
Kalifornsky, AK 99669

RFQ Kenai Peninsula College (KBC) Flagpole Replacement
Infrastructure
Post-Bid
$72,000 CJ est. value
Homer, AK 99603

Nanwalek-Port Graham Airport Relocation Drilling Services
Term Contract, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
AK

Skyline Drive Asphalt Rehabilitation
Infrastructure
Results
$344,805 CJ est. value
Soldotna, AK 99669

Apron And Willow Street Extension - City Of Kenai
Infrastructure
Conception
$2,350,000 CJ est. value
Kenai, AK 99611

Sewer System Installations
Infrastructure
Bidding
$200,000 CJ est. value
Kenai, AK 99611

Lilac Street Repairs - City Of Kenai
Infrastructure
Conception
$393,000 CJ est. value
Kenai, AK 99611

Runway Rehabilitation Project Construction - City of Kenai
Infrastructure
Conception
$22,790,000 CJ est. value
Kenai, AK 99611

Kenai Bluff Stabilization - City of Kenai
Infrastructure
Conception
$35,000,000 CJ est. value
Kenai, AK 99611

Phase II Willow Street Rehabilitation - City of Kenai
Infrastructure
Conception
$420,000 CJ est. value
Kenai, AK 99611

RFP Engineering - Dixon Diversion Project Engineering Services
Infrastructure
Conception
$1,000,000 CJ est. value
Homer, AK 99603

Last Updated 08/30/2022 04:39 PM
Project Title

Lift Station - Phase II - City Of Kenai

Physical Address View project details and contacts
City, State (County) Kenai, AK 99611   (Kenai Peninsula County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for major maintenance on existing lift stations to include access, structural and security and safety upgrades. As of August 30, 2022, this project is included in the City of Kenai FY 23-27 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Per the owner, movement for this project is not anticipated until first quarter 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents