Similar Projects
Heritage Parkway Commerce Center
New Construction - 315,000 SF
Conception
Melbourne, FL

Saint Stephen's Way Affordable Housing
New Construction
Design
Melbourne, FL 32901

Space Coast Town Centre Master Plan
New Construction
Design
West Melbourne, FL

The Learning Experience and Office Building Shell
New Construction - 20,000 SF
Post-Bid
Viera, FL

Edward Jones Branch #42759
Renovation - 922 SF
Post-Bid
Palm Bay, FL 32905

Construction Manager as Constructor for CAE USA Training and Support Center
New Construction - 334,145 SF
Results
Cape Canaveral, FL

Design-Build Hangar C, Office Improvements
Renovation
Results
Sebastian, FL

Tomahawk Robotics Office Building
Renovation - 6,707 SF
Construction
Melbourne, FL 32901

Sign Access Manufacturing Building
New Construction - 14,000 SF
Construction
Palm Shores, FL 32940

Dark Storm Industries Headquarters and Manufacturing Facility
New Construction
Pending Verification
$3,200,000 est. value
Titusville, FL 32780

Lockheed Martin
New Construction, Renovation - 230,993 SF
Design
Titusville, FL

Bragg Companies Florida Headquarters
New Construction - 14,095 SF
Construction
$2,002,000 est. value
Titusville, FL 32780

Two-Phase Design Build Integrated Capabilities Office (ICO) HQ
New Construction - 84,500 SF
Design
$25,000,000 to $100,000,000 est. value
Cape Canaveral, FL 32920

JP Donovan Office-Warehouse Expansion
Renovation, Addition - 20,550 SF
Construction
$1,800,000 est. value
Rockledge, FL 32955

Lowe Electric Office Building
New Construction - 3,000 SF
Design
Mims, FL

Last Updated 04/04/2022 01:01 PM
Project Title

L3 Harris Woody Burke Building

Physical Address View project details and contacts
City, State (County) Melbourne, FL 32901   (Brevard County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method
Project Status Construction Commenced November 2020, Construction Complete as of March 2022
Bids Due View project details and contacts
Estimated Value $1,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"Project Gull-Phase II" to include addition of a 3-sided carport West of existing structure in parking lot

Details

1 Office, 2 Stories Above Grade, 56,216 SF Renovation, Addition.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 08 - Openings, Entrances, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Plastering, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Grading, Fine Grading.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents