Similar Projects
Killian Creek Wastewater Treatment Plant Upgrade Phase 3
Bidding
$26,000,000 est. value
Stanley, NC 28164

Moyock Regional Wastewater Treatment Plant – 200,000 Gpd Expansion
Bidding
Currituck, NC 27929

J.D.Mackintosh Jr Water Treatment Plant Sodium Hypochlorite Addition
Post-Bid
Burlington, NC

Freemason and Beaver Hill Water Treatment Plant Upgrades
Post-Bid
Edenton, NC

Yadkin River WSP-Water Treatment and Finished Water Infrastructure
Results
Monroe, NC

WTP Expansion
Addition
Results
$7,900,000 to $11,800,000 est. value
Denver, NC

Davidson Water Pickle Plant Admin Rehab
Renovation
Construction
Welcome, NC 27374

Mallard Creek Water Reclamation Facility (WRF) and Lee S. Dukes Water Treatement Plant (WTP) Standby Power and Electrical Improvements
Bidding
Charlotte, NC 28262

DE Benton WTP Dewatering Facilities Construction
Post-Bid
Garner, NC

Mason Farm Wastewater Treatment Plant Solids Handling Improvements and Mason Farm Wastewater Treatment Plant Headworks Corrosion and Odor Control Improvement
Results
$4,000,000 to $4,500,000 est. value
Carrboro, NC

Wastewater Treatment Plant #2 Improvements - Phase I
Bidding
$1,700,000 est. value
Sylva, NC 28779

Neuse River Resource Recovery Facility Bioenergy Recovery
New Construction
Post-Bid
Raleigh, NC 27610

Y--PRESOLICITATION NOTICE FOR P-1043 WASTEWATER TREATMENT PLANT REPLACEMENT, HADNOT POINT, CAMP LEJEUNE, NC
- 25,000 SF
Results
$25,000 to $100,000,000 est. value
Jacksonville, NC 28542

DB Water and Wastewater Repairs, Phase 2
Bidding
$10,000,000 to $25,000,000 est. value
Camp Lejeune, NC 28547

Neilson WTP
Post-Bid
Clemmons, NC

Reported 01/30/2019 01:33 PM
Project Title

Compliance Services Building

Physical Address View project details and contacts
City, State (County) Durham, NC 27704   (Durham County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $55,000 to $65,000
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description The Department of Water Management Mist Lake Facility Expansion project consists of two buildings totaling approximately 116,000 square feet : one to house the administration, warehouse, and shops and the o ther to hold the equipment maintenance shop. The total acreage for the site at 1600 Mist Lake Drive , Durham, NC , after the appropriate land acquisitions will be approximately 58 acres with roughly 26 buildable acres. The South Durham Water Reclamation Facility project scope is to build a new regulatory compliance laboratory building at approximately 12,000 square feet on the South Durham Water Reclamation Facility site, located at 6605 Farrington Rd, Chapel Hill, NC. The total site area is approximately 98 acres, of which only a portion will be utilized for the project. 01A-Rough Cleaning, 01B-Final Cleaning, 02A-Abatement, 02B-Demolition, 03A-CIP Concrete, 03B-Precast Concrete, 04A-Masonry, 05A-Structural Steel&Misc Metals, 06A-Finish Carpentry & Millwork, 07A-Waterproofing & Sealants, 07B-Roofing, 07C-Fireproofing, 07D-Metal Panels, 08A-Doors/ Frames/ Hardware, 08B-Entrances, Storefronts, Glass & Glazing, 09A-Drywall & Framing, 09B-Acoustical Ceilings & Panels, 09C-Tile, 09D-Resilient Flooring & Carpet, 09E-Painting & Wall Covering, 09G-Terrazzo, 10A-Toilet Partitions & Accessories, 10B-Signage, 10C-Operable Partitions, 10D-Specialties, 10F-Pre-Engineered Structures, 11A-Equipment OFCI & CFCI, 12A-Window Treatments, 12B-Laboratory Casework & Equipment, 12C-Prefab Environmental Rooms, 12F-O/H Doors & Loading Dock Equipment, 21A-Fire Protection, 22A-Plumbing, 23A-Mechanical/ HVAC& Controls, 23C-HVAC Testing & Balancing, 26A-Electrical/ Fire Alarm/ Telecom/ AV & Security, 31A-Sitework, Utilities & Geo Exchange Loop, 32A-Fencing & Gates, 32B-Landscaping & Site Furnishings, 32D-Pavement, C&G and Sidewalks. Performance and Payment Bonds for 100% of the contract amount will be an ADD ALTERNATE Price.
Details
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents