Similar Projects
Reported | 01/30/2019 01:33 PM |
Project Title | Compliance Services Building |
Physical Address | View project details and contacts |
City, State (County) | Durham, NC 27704 (Durham County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Sub-Bidding |
Bids Due | View project details and contacts |
Estimated Value | $55,000 to $65,000 |
Plans Available from | Construction Manager as Contractor (CMc) |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Department of Water Management Mist Lake Facility Expansion project consists of two buildings totaling approximately 116,000 square feet : one to house the administration, warehouse, and shops and the o ther to hold the equipment maintenance shop. The total acreage for the site at 1600 Mist Lake Drive , Durham, NC , after the appropriate land acquisitions will be approximately 58 acres with roughly 26 buildable acres. The South Durham Water Reclamation Facility project scope is to build a new regulatory compliance laboratory building at approximately 12,000 square feet on the South Durham Water Reclamation Facility site, located at 6605 Farrington Rd, Chapel Hill, NC. The total site area is approximately 98 acres, of which only a portion will be utilized for the project. 01A-Rough Cleaning, 01B-Final Cleaning, 02A-Abatement, 02B-Demolition, 03A-CIP Concrete, 03B-Precast Concrete, 04A-Masonry, 05A-Structural Steel&Misc Metals, 06A-Finish Carpentry & Millwork, 07A-Waterproofing & Sealants, 07B-Roofing, 07C-Fireproofing, 07D-Metal Panels, 08A-Doors/ Frames/ Hardware, 08B-Entrances, Storefronts, Glass & Glazing, 09A-Drywall & Framing, 09B-Acoustical Ceilings & Panels, 09C-Tile, 09D-Resilient Flooring & Carpet, 09E-Painting & Wall Covering, 09G-Terrazzo, 10A-Toilet Partitions & Accessories, 10B-Signage, 10C-Operable Partitions, 10D-Specialties, 10F-Pre-Engineered Structures, 11A-Equipment OFCI & CFCI, 12A-Window Treatments, 12B-Laboratory Casework & Equipment, 12C-Prefab Environmental Rooms, 12F-O/H Doors & Loading Dock Equipment, 21A-Fire Protection, 22A-Plumbing, 23A-Mechanical/ HVAC& Controls, 23C-HVAC Testing & Balancing, 26A-Electrical/ Fire Alarm/ Telecom/ AV & Security, 31A-Sitework, Utilities & Geo Exchange Loop, 32A-Fencing & Gates, 32B-Landscaping & Site Furnishings, 32D-Pavement, C&G and Sidewalks. Performance and Payment Bonds for 100% of the contract amount will be an ADD ALTERNATE Price. | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |