Similar Projects
Northwestern Division Regional $115M Section 8(A) SB Set-Aside IDIQ MATOC
New Construction
Design

Northwestern Division Regional $115M Section 8(A) SB Set-Aside IDIQ MATOC
New Construction
Design

Construction of Area 5 Dining Facilities - Buildings 5-042 and 5-041
New Construction
Bidding
Little Falls, MN

Construction of a New Area 9 Battalion Headquarters Transient Training Building
New Construction
Post-Bid
$1,500,000 est. value
Little Falls, MN

National Guard Readiness Center
New Construction
Post-Bid
$17,399,809 est. value
Luverne, MN 56156

Construction of Area 5 Battalion Headquarters
New Construction - 7,100 SF
Results
Little Falls, MN

Aerial Port Facility
New Construction - 28,192 SF
Design
$10,000,000 to $25,000,000 est. value
Minneapolis, MN 55450

Mission Support Group Facility
New Construction - 22,564 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Minneapolis, MN

Last Updated 09/06/2021 05:40 AM
Project Title

Renovation of the Fergus Falls MN National Guard Armory

Physical Address View project details and contacts
City, State (County) Fergus Falls, MN 56537   (Otter Tail County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,438,499
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Complete renovation of 18,000 square foot Armory building. Complete overhaul of HVAC. Complete overhaul of electrical. New finish work including carpet and epoxy flooring, paint. New configurations and new partitions. 2. EPDM roof replacement. 3. Window replacement. 4. New enclosed mechanical equipment pad. 5. Parking lot replacement and site grading. 6. Construction and replacement of sanitary sewer, storm sewer, and water main. 7. Replacement of Electrical/Mechanical/Plumbing systems. This project has a 4% TG/ED/VO subcontracting goal.

Details

,, 36,000 SF - Military Facility, 18,000 SF Renovation, Military Facility, 18,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents