Similar Projects
2021 Street Paving Project-Round Two
Infrastructure
Post-Bid
Princeton, WV

Paving at Six Different Sites
Infrastructure
Post-Bid
$200,000 est. value
Princeton, WV

Tennis Court Repair and Resurfacing at Princeton Senior High School
New Construction, Infrastructure
Results
$74,100 est. value
Princeton, WV 24740

Princeton Thorn Street South
Infrastructure
Results
Princeton, WV 24740

Greenhouse - Montcalm High School
New Construction, Infrastructure
Pending Verification
$25,000 CJ est. value
Bluefield, WV 24701

Bluestone Travel Plaza - West Virginia Parkways Authority
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Princeton, WV 24740

Asphalt Milling and Paving Bid
Alteration
Post-Bid
$200,000 est. value
Bluefield, WV

Highway Pollinator Mitigation Site Development and Maintenance
Term Contract, Infrastructure
Results

RFP D/B - Restrooms and Green Area
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Princeton, WV 24740

Bat Base Paving
Infrastructure
Results
Bluefield, WV 24701

Fall 2021 Asphalt Paving
Infrastructure
Results
Bluefield, WV

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

Bridge Deck Replacement 3008S
Renovation, Infrastructure
Results
WV

Exit 1 Development
Infrastructure
Results
Bluefield, WV

Last Updated 12/28/2022 01:31 AM
Project Title

Andrew Scott Memorial Bridge

Physical Address View project details and contacts
City, State (County) Athens, WV 24712   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : STP0209003D Type of Work : Replace Bridge As of December 28, 2022, the project is in final planning status. The funding obligation date for the construction is March 28, 2023. WVDOT - Andrew Scott Memorial Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents