Similar Projects
Highway and Culvert Maintenance
Infrastructure
Bidding

Highway and Culvert Maintenance
Infrastructure
Bidding

Maintenance on Freedom Quad Wet Extended Detention Basin
Post-Bid
Albany, NY

Avery Road Culvert Repair
Post-Bid
Cold Spring, NY 10516

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Where and When Structures Repair
Results
Less than $4,700,000 est. value

Union Wall Repair
Infrastructure
Bidding
Saratoga Springs, NY 12866

2020 Town-Wide Drainage Improvements
Post-Bid
Hopewell Junction, NY 12533

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Results
Ballston Spa, NY 12020

Sheridan Bay Campground Site Improvements
Infrastructure
Bidding
Dunkirk, NY 14048

Rehabilitation of Large Culverts LC058-20 and LC154-20 on Summit Road CR 58 and Newport Road CR 154
Post-Bid
Less than $600,000 est. value
Newport, Schuyler, NY

Lasalle Park Shoreline Protection Project
Results
$5,000,000 to $10,000,000 est. value
Buffalo, NY 14207

Purchase of Culvert - End Safety Grates
Term Contract
Bidding
NY

Emmonsburg Road (CR 130) - Road Slope Armoring
Post-Bid
Salisbury Center, NY 13454

Culvert Replacement Project - Hulbert Hollow Road over a Tributary low Road over a Tributary to Michigan Creek
Results
Spencer, NY 14883

Reported 11/16/2021 12:00 AM
Project Title

Frear Park, Phase 1 Golf Course Improvements

Physical Address View project details and contacts
City, State (County) Troy, NY 12180   (Rensselaer County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Golf Course, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of fairway drainage on Holes 2 and 9-16. Installation of subdrainage into existing green of Hole 12. Renovation and addition of tees on Holes 2, 10, 13 & 14. Renovation and addition of sand bunkers on several holes. Development of new short game practice facility including chipping green, sand bunker and approach fairway. Removal of existing cart path and development of new asphalt paths at Holes 2 and 10. Work to include existing turf removal; grading of new features; topsoiling of disturbed areas; provision and installation of irrigation improvements; finish work and sodding and seeding of all work areas

Details

Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Lockers, Flagpoles, Flags and Banners.
Division 22 - Plumbing, Facility Sanitary Sewerage, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents